Planning and Scheduling in Manufacturing and Services

From MaRDI portal
Publication:4661528

DOI10.1007/b139030zbMath1078.90028OpenAlexW2506108511MaRDI QIDQ4661528

Michael L. Pinedo

Publication date: 30 March 2005

Published in: Springer Series in Operations Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1007/b139030




Related Items (37)

Programmed control of two-stage stochastic production systemsMinimization of the total weighted tardiness on a single machine scheduling problem with a position based learning effect and unequal release datesEstimating printed circuit board assembly times using neural networksReformulations and an exact algorithm for unrelated parallel machine scheduling problems with setup timesCircular coloring of graphs via linear programming and tabu searchINTERVAL-VALUED REPRESENTABILITY OF QUALITATIVE DATA: THE CONTINUOUS CASEPermutation flowshop scheduling with simple linear deteriorationProject-driven supply chains: integrating safety-stock and crashing decisions for recurrent projectsAn exact algorithm for solving the economic lot and supply scheduling problem using a power-of-two policyIntegrating employee timetabling with scheduling of machines and transporters in a job-shop environment: a mathematical formulation and an anarchic society optimization algorithmAlgorithms for the unrelated parallel machine scheduling problem with a resource constraintA stochastic programming model for scheduling call centers with global service level agreementsEFFICIENT GRID SCHEDULING THROUGH THE INCREMENTAL SCHEDULE-BASED APPROACHShop scheduling in manufacturing environments: a reviewAn application of dynamic programming to assign pressing tanks at wineriesA comparative study on three graph-based constructive algorithms for multi-stage scheduling with blockingDiscrete-time, economic lot scheduling problem on multiple, non-identical production linesNew dominance rules and exploration strategies for the \(1|r _{i}|\sum U _{i }\) scheduling problemScheduling jobs on parallel machines to minimize a regular step total cost functionTight complexity analysis of the relocation problem with arbitrary release datesConnectivity-and-hop-constrained design of electricity distribution networksComputing conditional sojourn time of a randomly chosen tagged customer in a BMAP/MSP/\(1\) queue under random order service disciplineData transfer planning with tree placement for collaborative environmentsScheduling coordination problems in supply chain planningModels and matheuristics for the unrelated parallel machine scheduling problem with additional resourcesCapacitated lot sizing and sequence dependent setup scheduling: An iterative approach for integrationA decomposition scheme for single stage scheduling problemsIterated greedy local search methods for unrelated parallel machine schedulingOptimal management of two-stage stochastic production systemsLong-term staffing based on qualification profilesIsomorphic scheduling problemsPlanning production using mathematical programming: The case of a woodturning companyUNIVERSAL CODOMAINS TO REPRESENT INTERVAL ORDERSSingle machine scheduling and due date assignment with positionally dependent processing timesA tabu search algorithm for scheduling pharmaceutical packaging operationsPower-aware scheduling for makespan and flowResource-Constrained Scheduling with Non-constant Capacity and Non-regular Activities




This page was built for publication: Planning and Scheduling in Manufacturing and Services