The complexity of the timetable‐based railway network design problem
From MaRDI portal
Publication:6196872
Recommendations
- Modeling uncertainty in the timetable-based railway network design problem
- Solving network design problems via decomposition, aggregation and approximation. With an application to the optimal expansion of railway infrastructure
- GRASP algorithms for the robust railway network design problem
- Nominal and robust train timetabling problems
- A probabilistic \((\max,+)\) approach for determining railway infrastructure capacity.
Cites work
- scientific article; zbMATH DE number 3639144 (Why is no real title available?)
- A survey on robustness in railway planning
- Approximation Algorithms for the Job Interval Selection Problem and Related Scheduling Problems
- Benders, metric and cutset inequalities for multicommodity capacitated network design
- Budget-constrained minimum cost flows
- GRASP algorithms for the robust railway network design problem
- Optimization of transit route network, vehicle headways and timetables for large-scale transit networks
- Robust possibilistic programming for socially responsible supply chain network design: a new approach
- Robust solutions for network design under transportation cost and demand uncertainty
- The Recognition of Series Parallel Digraphs
- The generalized fixed-charge network design problem
- Variable neighborhood search for integrated timetable based design of railway infrastructure
This page was built for publication: The complexity of the timetable‐based railway network design problem
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q6196872)