Integrated production and distribution scheduling with lifespan constraints
From MaRDI portal
(Redirected from Publication:744659)
Recommendations
- Integrated production and distribution scheduling with a perishable product
- The integrated production and transportation scheduling problem for a product with a short lifespan
- A zero-inventory production and distribution problem with a fixed customer sequence
- Supply chain batching problem with identical orders and lifespan
- Integrated production and distribution with fixed delivery departure dates
Cites work
- scientific article; zbMATH DE number 3639144 (Why is no real title available?)
- scientific article; zbMATH DE number 1062113 (Why is no real title available?)
- scientific article; zbMATH DE number 2050711 (Why is no real title available?)
- A zero-inventory production and distribution problem with a fixed customer sequence
- Algorithms for the Vehicle Routing and Scheduling Problems with Time Window Constraints
- An exact algorithm for a single-vehicle routing problem with time windows and multiple routes
- Integrated Production and Outbound Distribution Scheduling: Review and Extensions
- Integrated production and distribution scheduling with lifespan constraints
- Single vehicle routing with a predefined customer sequence and multiple depot returns
- Solving the medium newspaper production/distribution problem
- The integrated production and transportation scheduling problem for a product with a short lifespan
Cited in
(19)- A Benders decomposition-based heuristic for a production and outbound distribution scheduling problem with strict delivery constraints
- Solving an integrated scheduling and routing problem with inventory, routing and penalty costs
- Home chemotherapy delivery: an integrated production scheduling and multi-trip vehicle routing problem
- Integrated production and distribution scheduling with a perishable product
- Integrating deterioration and lifetime constraints in production and supply chain planning: a survey
- A review on integrated scheduling and outbound vehicle routing problems
- Integrated production and outbound distribution scheduling problems with job release dates and deadlines
- A new heuristic scheduling method for the make-pack-route problem in make-to-order supply chains
- Integrated scheduling of production and distribution with release dates and capacitated deliveries
- Integrated production and distribution scheduling with lifespan constraints
- Integrated scheduling on parallel batch processing machines with non-identical capacities
- A novel fuzzy mathematical model for an integrated supply chain planning using multi-objective evolutionary algorithm
- Supply chain batching problem with identical orders and lifespan
- The integrated production and transportation scheduling problem for a product with a short lifespan
- Integrated Production and Outbound Distribution Scheduling: Review and Extensions
- Hyper-heuristic for integrated due-window scheduling and vehicle routing problem for perishable products considering production quality
- A robust optimization model for agile and build-to-order supply chain planning under uncertainties
- Integrated production scheduling and delivery routing: complexity results and column generation
- Complexity results for an integrated single machine scheduling and outbound delivery problem with fixed sequence
This page was built for publication: Integrated production and distribution scheduling with lifespan constraints
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q744659)