Integrated production and distribution scheduling with lifespan constraints
From MaRDI portal
Publication:744659
DOI10.1007/S10479-012-1197-ZzbMATH Open1302.90089OpenAlexW2033433169MaRDI QIDQ744659FDOQ744659
Authors: Christian Viergutz, Sigrid Knust
Publication date: 26 September 2014
Published in: Annals of Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10479-012-1197-z
Recommendations
- Integrated production and distribution scheduling with a perishable product
- The integrated production and transportation scheduling problem for a product with a short lifespan
- A zero-inventory production and distribution problem with a fixed customer sequence
- Supply chain batching problem with identical orders and lifespan
- Integrated production and distribution with fixed delivery departure dates
Cites Work
- Title not available (Why is that?)
- Title not available (Why is that?)
- Title not available (Why is that?)
- The integrated production and transportation scheduling problem for a product with a short lifespan
- Integrated Production and Outbound Distribution Scheduling: Review and Extensions
- Algorithms for the Vehicle Routing and Scheduling Problems with Time Window Constraints
- Integrated production and distribution scheduling with lifespan constraints
- An exact algorithm for a single-vehicle routing problem with time windows and multiple routes
- A zero-inventory production and distribution problem with a fixed customer sequence
- Single vehicle routing with a predefined customer sequence and multiple depot returns
- Solving the medium newspaper production/distribution problem
Cited In (19)
- Solving an integrated scheduling and routing problem with inventory, routing and penalty costs
- Home chemotherapy delivery: an integrated production scheduling and multi-trip vehicle routing problem
- Integrated production and distribution scheduling with a perishable product
- A review on integrated scheduling and outbound vehicle routing problems
- Integrating deterioration and lifetime constraints in production and supply chain planning: a survey
- Integrated production and outbound distribution scheduling problems with job release dates and deadlines
- A new heuristic scheduling method for the make-pack-route problem in make-to-order supply chains
- Integrated scheduling of production and distribution with release dates and capacitated deliveries
- Integrated scheduling on parallel batch processing machines with non-identical capacities
- Integrated production and distribution scheduling with lifespan constraints
- A novel fuzzy mathematical model for an integrated supply chain planning using multi-objective evolutionary algorithm
- Supply chain batching problem with identical orders and lifespan
- The integrated production and transportation scheduling problem for a product with a short lifespan
- Integrated Production and Outbound Distribution Scheduling: Review and Extensions
- Hyper-heuristic for integrated due-window scheduling and vehicle routing problem for perishable products considering production quality
- A robust optimization model for agile and build-to-order supply chain planning under uncertainties
- Integrated production scheduling and delivery routing: complexity results and column generation
- Complexity results for an integrated single machine scheduling and outbound delivery problem with fixed sequence
- A Benders decomposition-based heuristic for a production and outbound distribution scheduling problem with strict delivery constraints
Uses Software
This page was built for publication: Integrated production and distribution scheduling with lifespan constraints
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q744659)