Pages that link to "Item:Q1762112"
From MaRDI portal
The following pages link to Minimizing total weighted flow time under uncertainty using dominance and a stability box (Q1762112):
Displaying 18 items.
- Single machine scheduling problem with interval processing times to minimize mean weighted completion time (Q337133) (← links)
- The robust (minmax regret) single machine scheduling with interval processing times and total weighted completion time objective (Q342174) (← links)
- Minimizing total weighted completion time with uncertain data: a stability approach (Q612208) (← links)
- Optimality region for job permutation in single-machine scheduling with uncertain processing times (Q827990) (← links)
- Stability polyhedra of optimal permutation of jobs servicing (Q893928) (← links)
- Stability analysis of efficient portfolios in a discrete variant of multicriteria investment problem with Savage's risk criteria (Q1650398) (← links)
- Two-machine no-wait flowshop scheduling problem with uncertain setup times to minimize maximum lateness (Q1715728) (← links)
- An efficient bicriteria algorithm for stable robotic flow shop scheduling (Q1753515) (← links)
- A better dominance relation and heuristics for two-machine no-wait flowshops with maximum lateness performance measure (Q1983744) (← links)
- Planning horizons based proactive rescheduling for stochastic resource-constrained project scheduling problems (Q1991259) (← links)
- Multicriteria investment problem with Savage's risk criteria: theoretical aspects of stability and case study (Q2190268) (← links)
- Minimizing total completion time in a two-machine no-wait flowshop with uncertain and bounded setup times (Q2244222) (← links)
- Single machine scheduling problem with interval processing times and total completion time objective (Q2283853) (← links)
- Algorithms for minimizing the number of tardy jobs for reducing production cost with uncertain processing times (Q2290196) (← links)
- Heuristic algorithms to maximize revenue and the number of jobs processed on parallel machines (Q2290308) (← links)
- An integrated model for production planning and cell formation in cellular manufacturing systems (Q2375564) (← links)
- Measures of problem uncertainty for scheduling with interval processing times (Q2393127) (← links)
- Robust permutation flow shop total weighted completion time problem: solution and application to the oil and gas industry (Q6109315) (← links)