Displaying 26 items.
- Activity-on-node networks with minimal and maximal time lags and their application to make-to-order production (Q1372767) (← links)
- A capacity-oriented hierarchical approach to single-item and small-batch production planning using project-scheduling methods (Q1374387) (← links)
- A steepest ascent approach to maximizing the net present value of projects (Q1396984) (← links)
- Order-based neighborhoods for project scheduling with nonregular objective functions. (Q1399577) (← links)
- Active and stable project scheduling (Q1401644) (← links)
- Scheduling of continuous and discontinuous material flows with intermediate storage restrictions (Q1772851) (← links)
- Project scheduling with inventory constraints (Q1812299) (← links)
- Batch scheduling in process industries: An application of resource-constrained project scheduling (Q1841814) (← links)
- Advanced production scheduling for batch plants in process industries (Q1850300) (← links)
- Recent results on resource-constrained project scheduling with time windows: Models, solution methods, and applications (Q1854657) (← links)
- Scheduling the factory pick-up of new cars (Q1884679) (← links)
- A cyclic approach to large-scale short-term planning in chemical batch production (Q2268519) (← links)
- (Q2712371) (← links)
- (Q3416545) (← links)
- (Q3426442) (← links)
- (Q3518847) (← links)
- (Q3619074) (← links)
- (Q4437036) (← links)
- Markov Models for System Throughput Analysis in Warehouse Design (Q4596490) (← links)
- (Q4664815) (← links)
- (Q4667080) (← links)
- Scheduling the production of rolling ingots: industrial context, model, and solution method (Q4814095) (← links)
- (Q5301710) (← links)
- Truncated branch-and-bound, schedule-construction, and schedule-improvement procedures for resource-constrained project scheduling (Q5945225) (← links)
- Project scheduling with calendars (Q5945226) (← links)
- Project scheduling with time windows and scarce resources. Temporal and resource-constrained project scheduling with regular and nonregular objective functions (Q5945489) (← links)