The following pages link to The third comprehensive survey on scheduling problems with setup times/costs (Q319774):
Displaying 50 items.
- A beam search heuristic for scheduling a single machine with release dates and sequence dependent setup times to minimize the makespan (Q342431) (← links)
- ILS heuristics for the single-machine scheduling problem with sequence-dependent family setup times to minimize total tardiness (Q670296) (← links)
- Reformulations and an exact algorithm for unrelated parallel machine scheduling problems with setup times (Q1628056) (← links)
- A comprehensive review of flowshop group scheduling literature (Q1651625) (← links)
- Algorithms for job scheduling problems with distinct time windows and general earliness/tardiness penalties (Q1652242) (← links)
- Solving the flexible job shop scheduling problem with sequence-dependent setup times (Q1681272) (← links)
- A novel integer programing formulation for scheduling with family setup times on a single machine to minimize maximum lateness (Q1683059) (← links)
- Enhanced migrating birds optimization algorithm for the permutation flow shop problem with sequence dependent setup times (Q1694317) (← links)
- Two-machine no-wait flowshop scheduling problem with uncertain setup times to minimize maximum lateness (Q1715728) (← links)
- Using high performance computing for unrelated parallel machine scheduling with sequence-dependent setup times: development and computational evaluation of a parallel branch-and-price algorithm (Q1725624) (← links)
- A worker constrained flexible job shop scheduling problem with sequence-dependent setup times (Q1733093) (← links)
- Minimizing the maximal ergonomic burden in intra-hospital patient transportation (Q1734337) (← links)
- No-wait flowshop scheduling problem with two criteria; total tardiness and makespan (Q1750472) (← links)
- A survey of scheduling problems with no-wait in process (Q1751258) (← links)
- Scheduling identical parallel machines with tooling constraints (Q1752870) (← links)
- Models and matheuristics for the unrelated parallel machine scheduling problem with additional resources (Q1753460) (← links)
- Using a variable neighborhood search to solve a bi-objective identical parallel machine scheduling problem (Q1791932) (← links)
- A better dominance relation and heuristics for two-machine no-wait flowshops with maximum lateness performance measure (Q1983744) (← links)
- Revisiting dynamic programming for precedence-constrained traveling salesman problem and its time-dependent generalization (Q1991103) (← links)
- An exact branch-and-price algorithm for scheduling rescue units during disaster response (Q1991141) (← links)
- Scheduling blocking flowshops with setup times via constraint guided and accelerated local search (Q2003564) (← links)
- Energy-saving policies for temperature-controlled production systems with state-dependent setup times and costs (Q2023980) (← links)
- Matheuristics for a parallel machine scheduling problem with non-anticipatory family setup times: application in the offshore oil and gas industry (Q2027046) (← links)
- A column generation-based diving heuristic to solve the multi-project personnel staffing problem with calendar constraints and resource sharing (Q2027048) (← links)
- Mathematical formulations for scheduling jobs on identical parallel machines with family setup times and total weighted completion time minimization (Q2029254) (← links)
- A new mathematical formulation for a potash-mine shift scheduling problem with a simultaneous assignment of machines and workers (Q2030539) (← links)
- Bi-objective parallel machine scheduling with additional resources during setups (Q2030593) (← links)
- Stochastic single machine scheduling problem as a multi-stage dynamic random decision process (Q2051165) (← links)
- Logic-based Benders decomposition method for the \textit{seru} scheduling problem with sequence-dependent setup time and DeJong's learning effect (Q2060398) (← links)
- Due date assignment scheduling with positional-dependent weights and proportional setup times (Q2086881) (← links)
- Empowering the configuration-IP: new PTAS results for scheduling with setup times (Q2089776) (← links)
- New exact and heuristic algorithms to solve the prize-collecting job sequencing problem with one common and multiple secondary resources (Q2106718) (← links)
- Unrelated parallel machine scheduling with multiple time windows: an application to Earth observation satellite scheduling (Q2108101) (← links)
- Minimizing the makespan on a single machine subject to modular setups (Q2124915) (← links)
- Due-window assignment scheduling with past-sequence-dependent setup times (Q2130374) (← links)
- Branch-and-price approach for robust parallel machine scheduling with sequence-dependent setup times (Q2140270) (← links)
- Single-machine due-date assignment scheduling with generalized earliness-tardiness penalties including proportional setup times (Q2142501) (← links)
- An evolution strategy approach for the distributed permutation flowshop scheduling problem with sequence-dependent setup times (Q2146995) (← links)
- Exact and heuristic algorithms for the parallel machine total completion time scheduling problem with dual resources, ready times, and sequence-dependent setup times (Q2147050) (← links)
- Scheduling wine bottling operations with multiple lines and sequence-dependent set-up times: robust formulation and a decomposition solution approach (Q2158042) (← links)
- Biased random-key genetic algorithm for scheduling identical parallel machines with tooling constraints (Q2184054) (← links)
- Branch-cut-and-price for scheduling deliveries with time windows in a direct shipping network (Q2197321) (← links)
- A hierarchical approach for solving an integrated packing and sequence-optimization problem in production of glued laminated timber (Q2219513) (← links)
- Group based job scheduling to increase the high-performance computing efficiency (Q2225839) (← links)
- An iterated local search procedure for the job sequencing and tool switching problem with non-identical parallel machines (Q2242193) (← links)
- Machine learning at the service of meta-heuristics for solving combinatorial optimization problems: a state-of-the-art (Q2242290) (← links)
- Enhanced salp swarm algorithm based on firefly algorithm for unrelated parallel machine scheduling with setup times (Q2243380) (← links)
- Minimizing total completion time in a two-machine no-wait flowshop with uncertain and bounded setup times (Q2244222) (← links)
- An application of unrelated parallel machine scheduling with sequence-dependent setups at Vestel Electronics (Q2273664) (← links)
- No-wait flowshop scheduling problem with separate setup times to minimize total tardiness subject to makespan (Q2284308) (← links)