Pages that link to "Item:Q4724399"
From MaRDI portal
The following pages link to Markov and Markov-Regenerative <scp>pert</scp> Networks (Q4724399):
Displaying 50 items.
- Resource allocation in multi-class dynamic PERT networks with finite capacity (Q320114) (← links)
- Scheduling modular projects on a bottleneck resource (Q398901) (← links)
- Resource allocation in dynamic PERT networks with finite capacity (Q420887) (← links)
- A new probabilistic approach to the path criticality in stochastic PERT (Q441034) (← links)
- A Laplace transform method for order statistics from nonidentical random variables and its application in phase-type distribution (Q553025) (← links)
- Evaluating project completion times when activity times are Weibull distributed (Q703928) (← links)
- Stochastic activity networks with truncated exponential activity times (Q815978) (← links)
- Longest path analysis in networks of queues: dynamic scheduling problems (Q858339) (← links)
- Modelling complex assemblies as a queueing network for lead time control (Q858340) (← links)
- A multi-objective lead time control problem in multi-stage assembly systems using genetic algorithms (Q869182) (← links)
- Multi-objective time-cost trade-off in dynamic PERT networks using an interactive approach (Q872140) (← links)
- A multi-objective resource allocation problem in dynamic PERT networks (Q945351) (← links)
- Extended dominance and a stochastic shortest path problem (Q954058) (← links)
- The risk element transmission theory research of multi-objective risk-time-cost trade-off (Q971715) (← links)
- Due date assignment for multistage assembly systems (Q1024730) (← links)
- Maximizing the net present value of a project under uncertainty (Q1039778) (← links)
- Scheduling projects with stochastic activity duration to maximize expected net present value (Q1042042) (← links)
- A classified bibliography of recent research relating to project risk management (Q1127233) (← links)
- Stochastic networks as models of cognition: Deriving predictions for resource-constrained mental processing (Q1182911) (← links)
- Estimating the mean completion time of PERT networks with exponentially distributed durations of activities (Q1319548) (← links)
- On criticality and sensitivity in activity networks (Q1590027) (← links)
- New strategies for stochastic resource-constrained project scheduling (Q1617288) (← links)
- Computing project makespan distributions: Markovian PERT networks revisited (Q1634063) (← links)
- Improving electromagnetism algorithm for solving resource allocation problem in stochastic networks (Q1652374) (← links)
- The preemptive stochastic resource-constrained project scheduling problem (Q1735185) (← links)
- Maximizing the expected net present value of a project with phase-type distributed activity durations: an efficient globally optimal solution procedure (Q1754200) (← links)
- A new structural mechanism for reducibility of stochastic PERT networks (Q1869478) (← links)
- Markovian analysis for performance evaluation and scheduling in \(m\) machine stochastic flow-shop with buffers of any capacity (Q1887781) (← links)
- Game-theoretic modeling of the project management contract (Q2229537) (← links)
- Determination of early warning time window for bottleneck resource buffer (Q2241213) (← links)
- Scheduling Markovian PERT networks to maximize the net present value (Q2270324) (← links)
- Minimizing the expected makespan of a project with stochastic activity durations under resource constraints (Q2356119) (← links)
- Risk taking in stochastic PERT networks (Q2367367) (← links)
- Multiobjective routing of hazardous materials in stochastic networks (Q2368293) (← links)
- Scheduling Markovian PERT networks to maximize the net present value: new results (Q2417109) (← links)
- A new approximation algorithm for obtaining the probability distribution function for project completion time (Q2460585) (← links)
- Lower bound for the mean project completion time in dynamic PERT networks (Q2462112) (← links)
- Mixture densities for project management activity times: A robust approach to PERT (Q2470106) (← links)
- Time-cost trade-off via optimal control theory in Markov PERT networks (Q2480200) (← links)
- A multi-objective resource allocation problem in PERT networks (Q2488911) (← links)
- A multi-objective lead time control problem in multistage assembly systems using an interactive method (Q2495993) (← links)
- A genetic algorithm approach for the time-cost trade-off in PERT networks (Q2572768) (← links)
- Project planning with alternative technologies in uncertain environments (Q2630099) (← links)
- Evolutionary algorithms for multi-objective stochastic resource availability cost problem (Q2656542) (← links)
- A surrogate indicator of criticality for stochastic project networks (Q3156288) (← links)
- Evaluating the project completion time when activity networks follow beta distribution (Q5164632) (← links)
- Due-date assignment for multi-server multi-stage assembly systems (Q5252913) (← links)
- (Q5389708) (← links)
- Project scheduling under the threat of catastrophic disruption (Q6112627) (← links)
- Analysis of the impact of corrective actions for stochastic project networks (Q6565390) (← links)