Pages that link to "Item:Q583096"
From MaRDI portal
The following pages link to Scheduling algorithms for flexible flowshops: Worst and average case performance (Q583096):
Displayed 47 items.
- Two-stage, single-lot, lot streaming problem for a \(1+2\) hybrid flow shop (Q330269) (← links)
- Hybrid flowshop scheduling with interstage job transportation (Q489104) (← links)
- Complexity and algorithms for two-stage flexible flowshop scheduling with availability constraints (Q814116) (← links)
- An immune algorithm approach to hybrid flow shops scheduling with sequence-dependent setup times (Q850231) (← links)
- Optimal scheduling of a two-stage hybrid flow shop (Q857819) (← links)
- A taxonomy of flexible flow line scheduling procedures (Q859681) (← links)
- Flowshop scheduling with interstage job transportation (Q892841) (← links)
- Scheduling problems in master-slave model (Q940888) (← links)
- A comparison of scheduling algorithms for flexible flow shop problems with unrelated parallel machines, setup times, and dual criteria (Q954034) (← links)
- Minimizing makespan in two-stage hybrid cross docking scheduling problem (Q1001000) (← links)
- Heuristics for a two-stage hybrid flowshop scheduling problem with ready times and a product-mix ratio constraint (Q1009206) (← links)
- A genetic algorithm for the proportionate multiprocessor open shop (Q1010271) (← links)
- Preemptive scheduling in a two-stage multiprocessor flow shop is NP-hard (Q1266667) (← links)
- A branch-and-bound algorithm with fuzzy inference for a permutation flowshop scheduling problem (Q1278537) (← links)
- Sequencing jobs for an automated manufacturing module with buffer (Q1278543) (← links)
- Combinatorial optimization models for production scheduling in automated manufacturing systems (Q1278813) (← links)
- Performance of scheduling algorithms for no-wait flowshops with parallel machines (Q1310022) (← links)
- Worst-case analysis of heuristics for open shops with parallel machines (Q1310023) (← links)
- Minimizing makespan in hybrid flowshops (Q1342286) (← links)
- A polynomial time approximation scheme for the two-stage multiprocessor flow shop problem (Q1566707) (← links)
- The flow shop with parallel machines: A tabu search approach (Q1609888) (← links)
- Two-stage no-wait hybrid flowshop scheduling with inter-stage flexibility (Q1698061) (← links)
- A review of exact solution methods for the non-preemptive multiprocessor flowshop problem (Q1767678) (← links)
- Minimum deviation algorithm for two-stage no-wait flowshops with parallel machines (Q1767900) (← links)
- Survey on fuzzy shop scheduling (Q1794871) (← links)
- Heuristics for scheduling in a flow shop with multiple processors (Q1806647) (← links)
- Powerful heuristics to minimize makespan in fixed, 3-machine, assembly-type flowshop scheduling (Q1869668) (← links)
- Scheduling flexible flow lines with sequence-dependent setup times (Q1876159) (← links)
- The hybrid flow shop scheduling problem (Q2270289) (← links)
- Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective (Q2379653) (← links)
- A note on makespan minimization in two-stage flexible flow shops with uniform machines (Q2433488) (← links)
- A two-stage hybrid flowshop scheduling problem with a function constraint and unrelated alternative machines (Q2456642) (← links)
- Scheduling two-stage hybrid flow shop with availability constraints (Q2496033) (← links)
- Scheduling in network flow shops (Q2564878) (← links)
- Three stage generalized flowshop: Scheduling civil engineering projects (Q2564880) (← links)
- A genetic algorithm for hybrid flowshops with sequence dependent setup times and machine eligibility (Q2572852) (← links)
- A review of TSP based approaches for flowshop scheduling (Q2572854) (← links)
- An introduction of dominant genes in genetic algorithm for FMS (Q3533197) (← links)
- A computational study of heuristics for two-stage flexible flowshops (Q4230155) (← links)
- Scheduling hybrid flowshops to minimize maximum tardiness or maximum completion time (Q4230171) (← links)
- Scheduling flexible flow lines with no in-process buffers (Q4398979) (← links)
- Comparison of Scheduling Rules in a Flow Shop with Multiple Processors: A Simulation (Q4420128) (← links)
- Scheduling in dial-indexed production lines (Q4474678) (← links)
- Scheduling manufacturing systems for delayed product differentiation in agile manufacturing (Q4807200) (← links)
- A hybrid two-stage flexible flowshop scheduling problem with m identical parallel machines and a burn-in processor separately (Q5436247) (← links)
- A flexible flowshop problem with total flow time minimization (Q5939584) (← links)
- Fuzzy flexible flow shops at two machine centers for continuous fuzzy domains (Q5946289) (← links)