Publication | Date of Publication | Type |
---|
Job Shop Scheduling With Two Jobs And Nonregular Objective Functions | 2023-04-24 | Paper |
Complexity of flow time minimization in a crossdock truck scheduling problem with asymmetric handover relations | 2022-03-11 | Paper |
Replication and sequencing of unreliable jobs on parallel machines | 2022-03-09 | Paper |
Time-critical testing and search problems | 2021-11-09 | Paper |
Locating and Platforms and Scheduling a Fleet of Drones for Emergency Delivery of Perishable Items | 2021-07-28 | Paper |
Nash equilibrium solutions in multi-agent project scheduling with milestones | 2021-06-08 | Paper |
The largest-Z-ratio-first algorithm is 0.8531-approximate for scheduling unreliable jobs on \(m\) parallel machines | 2021-04-07 | Paper |
Price of anarchy and price of stability in multi-agent project scheduling | 2020-01-20 | Paper |
Price of fairness in two-agent single-machine scheduling problems | 2019-02-25 | Paper |
Scheduling nonpreemptive jobs on parallel machines subject to exponential unrecoverable interruptions | 2018-07-11 | Paper |
Finding a Nash equilibrium and an optimal sharing policy for multiagent network expansion game | 2018-06-13 | Paper |
Complexity results for an integrated single machine scheduling and outbound delivery problem with fixed sequence | 2018-02-28 | Paper |
Scheduling with job-rejection and position-dependent processing times on proportionate flowshops | 2017-04-20 | Paper |
Two faster algorithms for coordination of production and batch delivery: a note | 2016-07-06 | Paper |
Coordination of production and interstage batch delivery with outsourced distribution | 2016-06-23 | Paper |
Scheduling two agent task chains with a central selection mechanism | 2015-07-28 | Paper |
Nash equilibria for the multi-agent project scheduling problem with controllable processing times | 2015-03-26 | Paper |
The list scheduling algorithm for scheduling unreliable jobs on two parallel machines | 2014-05-05 | Paper |
Multiagent Scheduling | 2014-03-06 | Paper |
Two Agents Competing for a Shared Machine | 2013-12-17 | Paper |
SOME NONSTANDARD FEATURES OF BARGAINING PROBLEMS | 2013-10-17 | Paper |
Parallel dedicated machines scheduling with chain precedence constraints | 2012-12-29 | Paper |
Single-Machine Scheduling Problems with Generalized Preemption | 2012-07-28 | Paper |
Demand allocation with latency cost functions | 2012-04-27 | Paper |
A job-shop problem with one additional resource type | 2011-10-18 | Paper |
Call planning in European pharmaceutical sales force management | 2010-07-30 | Paper |
A Lagrangian approach to single-machine scheduling problems with two competing agents | 2010-03-08 | Paper |
Scheduling three chains on two parallel machines | 2009-11-27 | Paper |
Computing the Nash solution for scheduling bargaining problems | 2009-09-13 | Paper |
Sequencing unreliable jobs on parallel machines | 2009-08-28 | Paper |
Optimal packet-to-slot assignment in mobile telecommunications | 2009-08-14 | Paper |
Scheduling Problems with Two Competing Agents | 2009-07-10 | Paper |
Covering a line segment with variable radius discs | 2008-12-17 | Paper |
Multi-agent single machine scheduling | 2008-03-31 | Paper |
Part batching and scheduling in a flexible cell to minimize setup costs | 2007-12-20 | Paper |
Polynomial algorithms for a two-class multiprocessor scheduling problem in mobile telecommunications systems | 2007-05-15 | Paper |
Supply chain scheduling: sequence coordination | 2006-10-30 | Paper |
An asymptotically exact algorithm for the high-multiplicity bin packing problem | 2005-10-31 | Paper |
An implicit enumeration scheme for the batch selection problem | 2005-01-12 | Paper |
Process selection and sequencing in a two-agents production system | 2004-06-11 | Paper |
https://portal.mardi4nfdi.de/entity/Q4511443 | 2003-06-19 | Paper |
A linear algorithm for the Hamiltonian completion number of the line graph of a tree | 2002-07-14 | Paper |
Partitioning of biweighted trees | 2002-06-11 | Paper |
Set-up coordination between two stages of a supply chain | 2002-06-09 | Paper |
Scheduling no-wait robotic cells with two and three machines | 2001-09-04 | Paper |
Part sequencing in three-machine no-wait robotic cells | 2000-01-01 | Paper |
Modelling and optimization of the assembly process in a flexible cell for aircraft panel manufacturing | 1999-06-08 | Paper |
Balancing flexible lines for car components assembly | 1999-06-01 | Paper |
Specialized inspection problems in serial production systems | 1998-08-16 | Paper |
No-wait flow shop scheduling with large lot sizes | 1998-06-22 | Paper |
An exact algorithm for the batch sequencing problem in a two-machine flow shop with limited buffer | 1998-05-26 | Paper |
Concurrent operations assignment and sequencing for particular assembly problems in flow lines | 1997-08-24 | Paper |
Batch scheduling in a two-machine flow shop with limited buffer | 1997-03-05 | Paper |
https://portal.mardi4nfdi.de/entity/Q5688736 | 1997-01-23 | Paper |
The Machine Duplication Problem in a Job Shop with Two Jobs | 1997-01-15 | Paper |
The Inspection Station Location Problem In Hazardous Material Transportation: Some Heuristics And Bounds | 1996-03-05 | Paper |
https://portal.mardi4nfdi.de/entity/Q4836303 | 1995-06-14 | Paper |
https://portal.mardi4nfdi.de/entity/Q3139223 | 1994-12-12 | Paper |
Flow Management in Flexible Manufacturing Cells with Pipeline Operations | 1993-06-29 | Paper |
https://portal.mardi4nfdi.de/entity/Q5753734 | 1990-01-01 | Paper |