Person:238068: Difference between revisions

From MaRDI portal
Person:238068
Created automatically from import231006081045
 
m AuthorDisambiguator moved page Eugene Levner to Eugene Levner: Duplicate
 
(No difference)

Latest revision as of 18:38, 9 December 2023

Available identifiers

zbMath Open levner.eugene-vMaRDI QIDQ238068

List of research outcomes

PublicationDate of PublicationType
Optimal bi-criterion planning of rescue and evacuation operations for marine accidents using an iterative scheduling algorithm2021-05-05Paper
Entropy-based algorithm for supply-chain complexity assessment2019-10-29Paper
On the existence of dominating 6-cyclic schedules in four-machine robotic cells2018-05-30Paper
An efficient bicriteria algorithm for stable robotic flow shop scheduling2018-05-29Paper
Improving the solution complexity of the scheduling problem with deadlines: A general technique2017-01-12Paper
An approximate binary search algorithm for the multiple-choice knapsack problem2016-06-09Paper
An improved approximation scheme for scheduling a maintenance and proportional deteriorating jobs2015-12-18Paper
THE MAXIMUM TRAVELING SALESMAN PROBLEM ON BANDED MATRICES2015-04-30Paper
An improved FPTAS for maximizing the weighted number of just-in-time jobs in a two-machine flow shop problem2014-08-18Paper
https://portal.mardi4nfdi.de/entity/Q54112712014-04-23Paper
Cyclic flowshop scheduling with operators and robots: Vyacheslav Tanaev's vision and lasting contributions2014-02-05Paper
A note on periodic schedules for linear precedence constraints2013-01-18Paper
https://portal.mardi4nfdi.de/entity/Q29172062012-09-27Paper
Parametric algorithms for 2-cyclic robot scheduling with interval processing times2011-10-18Paper
Cyclic scheduling in robotic flowshops with bounded work-in-process levels2011-04-29Paper
A faster algorithm for 2-cyclic robotic scheduling with a fixed robot route and interval processing times2011-01-21Paper
A note on a quadratic algorithm for the 2-cyclic robotic scheduling problem2009-11-06Paper
Multi-attribute Text Classification Using the Fuzzy Borda Method and Semantic Grades2009-07-02Paper
https://portal.mardi4nfdi.de/entity/Q36264322009-05-22Paper
A polynomial algorithm for 2-cyclic robotic scheduling: A non-Euclidean case2009-03-04Paper
Minimizing the cycle time of multiple-product processing networks with a fixed operation sequence, setups, and time-window constraints2008-01-21Paper
An efficient algorithm for multi-hoist cyclic scheduling with fixed processing times2008-01-15Paper
Cyclic multiple-robot scheduling with time-window constraints using a critical path approach2006-12-07Paper
Project Scheduling in AND–OR Graphs: A Generalization of Dijkstra's Algorithm2005-11-11Paper
On fast path-finding algorithms in AND-OR graphs2004-11-16Paper
https://portal.mardi4nfdi.de/entity/Q44531442004-03-07Paper
An Integrated Heuristic Approach to Power-Aware Real-Time Scheduling2003-06-11Paper
A polynomial algorithm for 2-degree cyclic robot scheduling2003-04-10Paper
Scheduling of parallel identical machines to maximize the weighted number of just-in-time jobs2002-07-30Paper
https://portal.mardi4nfdi.de/entity/Q45381532002-07-11Paper
An approximation algorithm with performance guarantees for the maximum traveling salesman problem on special matrices2002-06-24Paper
Cyclic scheduling in a robotic production line2002-04-29Paper
https://portal.mardi4nfdi.de/entity/Q44944592001-02-09Paper
Cyclic scheduling in robotic flowshops2001-01-17Paper
Minimizing the number of vehicles in periodic scheduling: The non-Euclidean case2000-09-10Paper
On-line scheduling in a surface treatment system2000-03-19Paper
Optimal control of assembling complexes under predetermined maintenance conditions2000-01-11Paper
An improved algorithm for cyclic flowshop scheduling in a robotic cell1999-02-22Paper
A parametric critical path problem and an application for cyclic scheduling1999-01-25Paper
A polynomial algorithm for scheduling small-scale manufacturing cells served by multiple robots1998-09-27Paper
A strongly polynomial algorithm for no-wait cyclic robotic flowshop scheduling1998-03-18Paper
Minimizing the number of robots to meet a given cyclic schedule1998-01-19Paper
Infinite-horizon scheduling algorithms for optimal search for hidden objects1997-01-19Paper
Flowshop Scheduling of Robotic Cells with Job-dependent Transportation and Set-up Effects1996-03-07Paper
Scheduling a two-machine robotic cell: A solvable case1995-08-27Paper
https://portal.mardi4nfdi.de/entity/Q43020841995-04-17Paper
A network flow algorithm for just-in-time project scheduling1995-01-11Paper
A Fast Approximation Algorithm For The Subset-Sum Problem1994-11-29Paper
https://portal.mardi4nfdi.de/entity/Q43130841994-11-10Paper
https://portal.mardi4nfdi.de/entity/Q39793081992-06-26Paper
https://portal.mardi4nfdi.de/entity/Q33585091990-01-01Paper
Scheduling models and methods in optimal freight transportation planning1989-01-01Paper
https://portal.mardi4nfdi.de/entity/Q34765841989-01-01Paper
https://portal.mardi4nfdi.de/entity/Q34766201989-01-01Paper
https://portal.mardi4nfdi.de/entity/Q37413921983-01-01Paper
Fast approximation algorithm for job sequencing with deadlines1981-01-01Paper
https://portal.mardi4nfdi.de/entity/Q38888461980-01-01Paper
https://portal.mardi4nfdi.de/entity/Q38920691980-01-01Paper
https://portal.mardi4nfdi.de/entity/Q30501291979-01-01Paper
https://portal.mardi4nfdi.de/entity/Q39074091979-01-01Paper
An effective solution of the Bellman-Johnson problem on a tree-like network1978-01-01Paper
https://portal.mardi4nfdi.de/entity/Q38920561978-01-01Paper
https://portal.mardi4nfdi.de/entity/Q41815701977-01-01Paper
Optimal planning of part's machining on a number of machines1969-01-01Paper

Research outcomes over time


Doctoral students

No records found.


Known relations from the MaRDI Knowledge Graph

PropertyValue
MaRDI profile typeMaRDI person profile
instance ofhuman


This page was built for person: Eugene Levner