Luk N. Van Wassenhove

From MaRDI portal
Revision as of 16:27, 24 September 2023 by Import230924090903 (talk | contribs) (Created automatically from import230924090903)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Person:439542

Available identifiers

zbMath Open van-wassenhove.luk-nMaRDI QIDQ439542

List of research outcomes





PublicationDate of PublicationType
Fleet Coordination in Decentralized Humanitarian Operations Funded by Earmarked Donations2021-01-08Paper
Managing high-end ex-demonstration product returns2019-03-28Paper
Installed base management versus selling in monopolistic and competitive environments2018-11-19Paper
Official recycling and scavengers: symbiotic or conflicting?2012-08-16Paper
Queuing for Expert Services2012-02-29Paper
Reverse Channel Design: The Case of Competing Retailers2012-02-21Paper
Time Value of Commercial Product Returns2012-02-21Paper
The Economics of Remanufacturing Under Limited Component Durability and Finite Product Life Cycles2012-02-21Paper
Closed-Loop Supply Chain Models with Product Remanufacturing2012-02-19Paper
Inventory Control in Hybrid Systems with Remanufacturing2012-02-12Paper
Quality competition for screening and treatment services2010-11-03Paper
On the effect of quality overestimation in remanufacturing2010-10-25Paper
From preparedness to partnerships: case study research on humanitarian logistics2010-05-31Paper
OR FORUM—The Evolution of Closed-Loop Supply Chain Research2010-03-06Paper
Lagrangean relaxation based heuristics for lot sizing with setup times2008-11-20Paper
Branch and bound algorithms for single machine scheduling with batching to minimize the number of late jobs2007-12-20Paper
Humanitarian aid logistics: supply chain management in high gear2006-07-06Paper
Concurrent product and closed-loop supply chain design with an application to refrigerators2005-04-26Paper
The effect of remanufacturing on procurement decisions for resellers in secondary markets2005-02-09Paper
https://portal.mardi4nfdi.de/entity/Q31580942005-01-20Paper
Cooperation between strands of practice: challenges and opportunities for the renewal of OR2005-01-19Paper
Ethics outside, within, or beyond OR models?2004-01-05Paper
Local Search Heuristics for the Single Machine Total Weighted Tardiness Scheduling Problem2003-12-16Paper
The impact of ERP on supply chain management: Exploratory findings from a European Delphi study2003-04-10Paper
https://portal.mardi4nfdi.de/entity/Q31517672002-10-16Paper
The domain and interpretation of utility functions: An exploration2002-08-21Paper
Knowledge Driven Quality Improvement2002-07-08Paper
https://portal.mardi4nfdi.de/entity/Q44999212000-09-04Paper
Solving the discrete lotsizing and scheduling problem with sequence dependent set-up costs and set-up times using the travelling salesman problem with time windows1999-08-19Paper
https://portal.mardi4nfdi.de/entity/Q38390141999-06-08Paper
Strands of practice in OR (the practitioner's dilemma)1999-05-05Paper
Quantitative models for reverse logistics: A review1999-04-27Paper
Branch and bound algorithms for single-machine scheduling with batch set-up times to minimize total weighted completion time1999-03-07Paper
Local search heuristics for single-machine scheduling with batching to minimize the number of late jobs1998-11-29Paper
Interactions between operational research and environmental management1998-11-05Paper
The capacitated distribution and waste disposal problem1998-10-07Paper
Decentralization of responsibility for site decontamination projects: A budget allocation approach1998-07-14Paper
Exact and approximation algorithms for the operational fixed interval scheduling problem1998-06-11Paper
An integrated and structured approach to improve maintenance1998-06-11Paper
Exact and Approximation Algorithms for the Tactical Fixed Interval Scheduling Problem1998-06-02Paper
Local search heuristics for single machine scheduling with batch set-up times to minimize total weighted completion time1997-12-04Paper
Single Machine Scheduling to Minimize Total Weighted Late Work1996-10-20Paper
The Two-Stage Assembly Scheduling Problem: Complexity and Approximation1995-09-25Paper
On the coordination of product and by-product flows in two-level distribution networks: Model formulations and solution procedures1995-02-09Paper
A Fully Polynomial Approximation Scheme for Scheduling a Single Machine to Minimize Total Weighted Late Work1994-11-17Paper
A set partitioning heuristic for the generalized assignment problem1994-05-05Paper
The single-item discrete lotsizing and scheduling problem: Optimization by linear and dynamic programming1994-03-24Paper
A Dual Ascent and Column Generation Heuristic for the Discrete Lotsizing and Scheduling Problem with Setup Times1993-08-31Paper
Statistical search methods for lotsizing problems1993-08-16Paper
A survey of algorithms for the generalized assignment problem1993-01-16Paper
https://portal.mardi4nfdi.de/entity/Q40166811993-01-16Paper
Single Machine Scheduling to Minimize Total Late Work1993-01-16Paper
Integrating Scheduling with Batching and Lot-Sizing: A Review of Algorithms and Complexity1993-01-16Paper
Approximation algorithms for scheduling a single machine to minimize total late work1992-12-17Paper
Some Extensions of the Discrete Lotsizing and Scheduling Problem1992-06-26Paper
Multilevel capacitated lotsizing complexity and LP-based heuristics1991-01-01Paper
Set partitioning and column generation heuristics for capacitated dynamic lotsizing1990-01-01Paper
A survey of algorithms for the single machine total weighted tardiness scheduling problem1990-01-01Paper
https://portal.mardi4nfdi.de/entity/Q52028181990-01-01Paper
Multi-Item Single-Level Capacitated Dynamic Lot-Sizing Heuristics: A General Review1988-01-01Paper
Algorithms for Scheduling a Single Machine to Minimize the Weighted Number of Late Jobs1988-01-01Paper
Dynamic programming and decomposition approaches for the single machine total tardiness problem1987-01-01Paper
A simple heuristic for the multi-item single level capacitated lotsizing problem1986-01-01Paper
A Multiplier Adjustment Method for the Generalized Assignment Problem1986-01-01Paper
A Branch and Bound Algorithm for the Total Weighted Tardiness Problem1985-01-01Paper
An algorithm for single machine sequencing with deadlines to minimize total weighted completion time1983-01-01Paper
A bicriterion approach to time/cost trade-offs in sequencing1982-01-01Paper
A decomposition algorithm for the single machine total tardiness problem1982-01-01Paper
https://portal.mardi4nfdi.de/entity/Q39388261982-01-01Paper
A large scale location-allocation problem in the natural rubber industry1981-01-01Paper
Solving a bicriterion scheduling problem1979-01-01Paper
Four solution techniques for a general one machine scheduling problem. A comparative study1978-01-01Paper

Research outcomes over time

This page was built for person: Luk N. Van Wassenhove