Analysis of scheduling schemes and heuristic rules performance in resource-constrained multiproject scheduling

From MaRDI portal
Revision as of 01:00, 30 January 2024 by Import240129110155 (talk | contribs) (Created automatically from import240129110155)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Publication:5948204

DOI10.1023/A:1010966401888zbMath0990.90511OpenAlexW1533019039MaRDI QIDQ5948204

Pilar Tormos, Antonio Lova

Publication date: 31 October 2001

Published in: Annals of Operations Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1023/a:1010966401888




Related Items (19)

Managing and modelling general resource transfers in (multi-)project schedulingResource allocation in multi-class dynamic PERT networks with finite capacityIntegrated multi-project planning and scheduling -- a multiagent approachSolving resource-constrained multiple project scheduling problem using timed colored Petri netsMulti‐mode resource‐constrained project scheduling using modified variable neighborhood search heuristicMulti-project scheduling: a benchmark analysis of metaheuristic algorithms on various optimisation criteria and due datesResource-constrained multi-project scheduling problem: a surveyResource allocation in dynamic PERT networks with finite capacityA \((\mu ,\, \lambda )\)-coordination mechanism for agent-based multi-project schedulingAn applicable method for modifying over-allocated multi-mode resource constraint schedules in the presence of preemptive resourcesSimplifying multiproject scheduling problem based on design structure matrix and its solution by an improved aiNet algorithmMulti-project scheduling with two-stage decompositionA market-based multi-agent system model for decentralized multi-project schedulingA random generator of resource-constrained multi-project network problemsA learning-based optimization approach to multi-project schedulingA multi‐agent system for the decentralized resource‐constrained multi‐project scheduling problemResource Constrained Multi-Project Scheduling Problem with Resource Transfer TimesA heuristic solution framework for the resource constrained (multi-)project scheduling problem with sequence-dependent transfer timesAn efficient genetic algorithm for decentralized multi-project scheduling with resource transfers







This page was built for publication: Analysis of scheduling schemes and heuristic rules performance in resource-constrained multiproject scheduling