A hybrid method based on linear programming and variable neighborhood descent for scheduling production in open-pit mines

From MaRDI portal
Revision as of 15:51, 30 January 2024 by Import240129110113 (talk | contribs) (Created automatically from import240129110113)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Publication:887202

DOI10.1007/S10898-014-0185-ZzbMath1326.90026OpenAlexW1965868850WikidataQ59433925 ScholiaQ59433925MaRDI QIDQ887202

Jacques A. Ferland, Amina Lamghari, Roussos Dimitrakopoulos

Publication date: 28 October 2015

Published in: Journal of Global Optimization (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1007/s10898-014-0185-z




Related Items (6)


Uses Software



Cites Work




This page was built for publication: A hybrid method based on linear programming and variable neighborhood descent for scheduling production in open-pit mines