LP-based disaggregation approaches to solving the open pit mining production scheduling problem with block processing selectivity

From MaRDI portal
Publication:958440

DOI10.1016/j.cor.2007.12.006zbMath1162.90446OpenAlexW2130796978WikidataQ59139586 ScholiaQ59139586MaRDI QIDQ958440

Irina Dumitrescu, Ambros M. Gleixner, Gary Froyland, Natashia Boland

Publication date: 4 December 2008

Published in: Computers \& Operations Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.cor.2007.12.006




Related Items

An integrated approach for earthwork allocation, sequencing and routingMedium range optimization of copper extraction planning under uncertainty in future copper pricesOptimization-based heuristics for underground mine schedulingLong term production planning of open pit mines by ant colony optimizationConcurrent open-pit mine production and in-pit crushing–conveying system planningAggregation heuristic for the open-pit block scheduling problemNetwork-flow based algorithms for scheduling production in multi-processor open-pit mines accounting for metal uncertaintyA recursive time aggregation-disaggregation heuristic for the multidimensional and multiperiod precedence-constrained knapsack problem: an application to the open-pit mine block sequencing problemMineLib: a library of open pit mining problemsEvolutionary approach for large-scale mine schedulingNew partial aggregations for multicommodity network flow problems: an application to the fixed-charge network design problemA hybrid method based on linear programming and variable neighborhood descent for scheduling production in open-pit minesConstructing branching trees of geostatistical simulationsA real-world mine excavators timetabling methodology in open-pit miningProduction Scheduling for Strategic Open Pit Mine Planning: A Mixed-Integer Programming ApproachTailored Lagrangian relaxation for the open pit block sequencing problemThe precedence constrained knapsack problem: separating maximally violated inequalitiesA study of the Bienstock-Zuckerberg algorithm: applications in mining and resource constrained project schedulingA local branching heuristic for the open pit mine production scheduling problemLinear models for stockpiling in open-pit mine production scheduling problemsOptimizing a mineral value chain with market uncertainty using Benders decompositionA sliding time window heuristic for open pit mine block sequencingA solution approach for optimizing long- and short-term production scheduling at LKAB's kiruna mineA hybrid heuristic algorithm for the open-pit-mining operational planning problemOpen pit mine planning with degradation due to stockpilingHyper-heuristic approaches for strategic mine planning under uncertaintyPractical performance of an open pit mine scheduling model considering blending and stockpilingHierarchical Benders Decomposition for Open-Pit Mine Block Sequencing


Uses Software


Cites Work