Modeling realistic hybrid flexible flowshop scheduling problems

From MaRDI portal
Revision as of 17:55, 30 January 2024 by Import240129110113 (talk | contribs) (Created automatically from import240129110113)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Publication:941540

DOI10.1016/J.COR.2006.07.014zbMath1180.90135OpenAlexW1988634397MaRDI QIDQ941540

Rubén Ruiz, Thijs Urlings, Funda Sivrikaya-Serifoglu

Publication date: 1 September 2008

Published in: Computers \& Operations Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.cor.2006.07.014




Related Items (25)

Machine scheduling in underground mining: an application in the potash industryA novel Lagrangian relaxation approach for a hybrid flowshop scheduling problem in the steelmaking-continuous casting processHybrid flexible flowshop problems: models and solution methodsReview and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspectiveQuality assurance laboratory planning system to maximize worker preference subject to certification and preference balance constraintsA heuristic method for two-stage hybrid flow shop with dedicated machinesIterated greedy algorithms enhanced by hyper-heuristic based learning for hybrid flexible flowshop scheduling problem with sequence dependent setup times: a case study at a manufacturing plantAn MO‐GVNS algorithm for solving a multiobjective hybrid flow shop scheduling problemScheduling for a flow shop with waiting time constraints and missing operations in semiconductor manufacturingA hybrid flowshop scheduling problem for a cold treating process in seamless steel tube productionEffective metaheuristics for scheduling a hybrid flowshop with sequence-dependent setup timesA survey of scheduling problems with setup times or costsTwo-stage hybrid flow shop with recirculationA discrete time exact solution approach for a complex hybrid flow-shop scheduling problem with limited-wait constraintsTwo-stage hybrid flow shop with precedence constraints and parallel machines at second stageThe hybrid flow shop scheduling problemMIP-based decomposition strategies for large-scale scheduling problems in multiproduct multistage batch plants: a benchmark scheduling problem of the pharmaceutical industryShifting representation search for hybrid flexible flowline problemsA simulated annealing with multiple-search paths and parallel computation for a comprehensive flowshop scheduling problemA multi-objective variable neighborhood search algorithm for solving the hybrid flow shop problemMinimizing makespan in two-stage hybrid cross docking scheduling problemAlgorithms for a realistic variant of flowshop schedulingLagrangian relaxation with cut generation for hybrid flowshop scheduling problems to minimize the total weighted tardinessA tabu search algorithm for scheduling pharmaceutical packaging operationsThe distributed permutation flowshop scheduling problem




Cites Work




This page was built for publication: Modeling realistic hybrid flexible flowshop scheduling problems