Theoretical aspects of multicriteria flight gate scheduling: Deterministic and fuzzy models
From MaRDI portal
Publication:983626
DOI10.1007/S10951-009-0112-1zbMath1193.90107OpenAlexW2010851774MaRDI QIDQ983626
Publication date: 24 July 2010
Published in: Journal of Scheduling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10951-009-0112-1
project schedulingtime windowsmultiple criteria optimizationairport gate assignmentfuzzy flight gate schedulingPareto simulated annealing
Multi-objective and goal programming (90C29) Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (3)
Flight gate assignment and recovery strategies with stochastic arrival and departure times ⋮ Learning-driven feasible and infeasible tabu search for airport gate assignment ⋮ Flight gate scheduling with respect to a reference schedule
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Optimization by Simulated Annealing
- Computational experience with a backtracking algorithm for solving a general class of precedence and resource-constrained scheduling problems
- A heuristic approach for airport gate assignments for stochastic flight delays
- Scheduling subject to resource constraints: Classification and complexity
- Fuzzy sets as a basis for a theory of possibility
- A branch and bound algorithm for the resource-constrained project scheduling problem
- Interactive analysis of multiple-criteria project scheduling problems
- Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm
- DSS for multiobjective project scheduling
- A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version.
- A branch-and-bound algorithm for the resource-constrained project scheduling problem
- Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem
- Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models
- Reference point approach for multiple decision makers
- The over-constrained airport gate assignment problem
- Resource-constrained project scheduling: Notation, classification, models, and methods
- Project scheduling with resource constraints: A branch and bound approach. Note by Frederik Kaefer
- Project scheduling with time windows. From theory to applications.
- Proper efficiency and the theory of vector maximization
- A Time-Oriented Branch-and-Bound Algorithm for Resource-Constrained Project Scheduling with Generalised Precedence Constraints
- A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem
- Resource-constrained project scheduling by simulated annealing
- A simulated annealing algorithm for resource constrained project scheduling problems
- Pareto simulated annealing—a metaheuristic technique for multiple‐objective combinatorial optimization
- Project scheduling with multiple modes: A comparison of exact algorithms
- New heuristics for over-constrained flight to gate assignments
- Search Heuristics for Resource Constrained Project Scheduling
- Multicriteria Optimization
- Disruption management in flight gate scheduling
- Project scheduling with multiple modes: A genetic algorithm
- Simulated annealing for multi-mode resource-constrained project scheduling
This page was built for publication: Theoretical aspects of multicriteria flight gate scheduling: Deterministic and fuzzy models