Analysis of a single-stage, single-product, stochastic, MRP-controlled assembly system
From MaRDI portal
Publication:1296001
DOI10.1016/S0377-2217(97)00047-7zbMath0947.90039MaRDI QIDQ1296001
Pradip Som, Wilbert E. Wilhelm
Publication date: 23 September 1999
Published in: European Journal of Operational Research (Search for Journal in Brave)
manufacturingmodelingMarkov renewal processend-product inventory positionKitting in assemblymaterial requirements planning control
Related Items
Performance analysis of a kitting process in stochastic assembly systems ⋮ Supply chain models for an assembly system with preprocessing of raw materials ⋮ Optimal supply planning in MRP environments for assembly systems with random component procurement times ⋮ Multi-objective optimization for inventory control in two-level assembly systems under uncertainty of lead times ⋮ Generalized newsboy model to compute the optimal planned lead times in assembly systems ⋮ Calculating safety stocks for assembly systems with random component procurement lead times: a branch and bound algorithm
Cites Work
- Unnamed Item
- Unnamed Item
- MRP and inventories
- Kitting process in a stochastic assembly system
- Models for Design and Control of Stochastic, Multi-Item Batch Production Systems
- Setting Planned Leadtimes in Serial Production Systems with Tardiness Costs
- Technical Note—A One-Product Production/Inventory Problem under Continuous Review Policy
- Push and Pull Production Systems: Issues and Comparisons
- Safety Stock versus Safety Time in MRP Controlled Production Systems
- An Analytical Method for Performance Evaluation of Kanban Controlled Production Systems