Scheduling a flowline manufacturing cell with sequence dependent family setup times

From MaRDI portal
Revision as of 03:00, 1 February 2024 by Import240129110113 (talk | contribs) (Created automatically from import240129110113)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Publication:1580980


DOI10.1016/S0377-2217(99)00387-2zbMath0965.90023MaRDI QIDQ1580980

Jatinder N. D. Gupta, Asoo J. Vakharia, Jeffrey E. Schaller

Publication date: 23 November 2000

Published in: European Journal of Operational Research (Search for Journal in Brave)


90B50: Management decision making, including multiple objectives

90B35: Deterministic scheduling theory in operations research

90C59: Approximation methods and heuristics in mathematical programming


Related Items

Set-up games: a heuristic game-theoretic approach to set-up decisions for heterarchical manufacturing systems, A new encoding scheme-based hybrid algorithm for minimising two-machine flow-shop group scheduling problem, Scheduling in cellular manufacturing systems: an heuristic approach, Flow shop batching and scheduling with sequence-dependent setup times, A branch and bound enhanced genetic algorithm for scheduling a flowline manufacturing cell with sequence dependent family setup times, Total flow time minimization in a flowshop sequence-dependent group scheduling problem, Process planning for circuit card assembly on a series of dual head placement machines, Scheduling jobs families with learning effect on the setup, Metaheuristics for scheduling a non-permutation flowline manufacturing cell with sequence dependent family setup times, Robust scheduling on a single machine to minimize total flow time, Solving the serial batching problem in job shop manufacturing systems, Minimizing total completion time in the flexible flowshop sequence-dependent group scheduling problem, A survey of scheduling problems with setup times or costs, A branch-and-bound algorithm for three-machine flowshop scheduling problem to minimize total completion time with separate setup times, A review of TSP based approaches for flowshop scheduling, Using genetic algorithm in two-machine flexible flow-shop scheduling with setup times, Using simulated annealing to schedule a flowshop manufacturing cell with sequence-dependent family setup times, Permutation and non-permutation schedules for the flowline manufacturing cell with sequence dependent family setups



Cites Work