Scheduling a flowline manufacturing cell with sequence dependent family setup times

From MaRDI portal
Revision as of 02:00, 1 February 2024 by Import240129110113 (talk | contribs) (Created automatically from import240129110113)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Publication:1580980

DOI10.1016/S0377-2217(99)00387-2zbMath0965.90023MaRDI QIDQ1580980

Jatinder N. D. Gupta, Asoo J. Vakharia, Jeffrey E. Schaller

Publication date: 23 November 2000

Published in: European Journal of Operational Research (Search for Journal in Brave)




Related Items (33)

Permutation and non-permutation schedules for the flowline manufacturing cell with sequence dependent family setupsHybrid flow shop scheduling with sequence dependent family setup time and uncertain due datesNew effective MILP models for PFSPs arising from real applicationsEffect of solution representations on tabu search in scheduling applicationsA comprehensive review of flowshop group scheduling literatureAn enhanced tabu search algorithm to minimize a bi-criteria objective in batching and scheduling problems on unrelated-parallel machines with desired lower bounds on batch sizesProcess planning for circuit card assembly on a series of dual head placement machinesSolving the serial batching problem in job shop manufacturing systemsScheduling jobs families with learning effect on the setupModeling and solving the flow-shop scheduling problem with sequence-dependent setup times by firefly algorithm (case study: automotive industry)A hybrid heuristic approach to minimize number of tardy jobs in group technology systemsIntelligent optimization under the makespan constraint: rapid evaluation mechanisms based on the critical machine for the distributed flowshop group scheduling problemEnergy-aware production scheduling in the flow shop environment under sequence-dependent setup times, group scheduling and renewable energy constraintsAn asymmetric traveling salesman problem based matheuristic algorithm for flowshop group scheduling problemA performance comparison and evaluation of metaheuristics for a batch scheduling problem in a multi-hybrid cell manufacturing system with skilled workforce assignmentFlow shop batching and scheduling with sequence-dependent setup timesA hybrid metaheuristic approach for minimizing the total flow time in a flow shop sequence dependent group scheduling problemUsing genetic algorithm in two-machine flexible flow-shop scheduling with setup timesFamily scheduling with batch availability in flow shops to minimize makespanA survey of scheduling problems with setup times or costsMetaheuristics for scheduling a non-permutation flowline manufacturing cell with sequence dependent family setup timesRobust scheduling on a single machine to minimize total flow timeA new encoding scheme-based hybrid algorithm for minimising two-machine flow-shop group scheduling problemSet-up games: a heuristic game-theoretic approach to set-up decisions for heterarchical manufacturing systemsA branch and bound enhanced genetic algorithm for scheduling a flowline manufacturing cell with sequence dependent family setup timesUsing simulated annealing to schedule a flowshop manufacturing cell with sequence-dependent family setup timesScheduling in cellular manufacturing systems: an heuristic approachTotal flow time minimization in a flowshop sequence-dependent group scheduling problemA branch-and-bound algorithm for three-machine flowshop scheduling problem to minimize total completion time with separate setup timesA review of TSP based approaches for flowshop schedulingA scheduling problem in the baking industryAn efficient model-based branch-and-price algorithm for unrelated-parallel machine batching and scheduling problemsMinimizing total completion time in the flexible flowshop sequence-dependent group scheduling problem




Cites Work




This page was built for publication: Scheduling a flowline manufacturing cell with sequence dependent family setup times