A multicriteria heuristic method to improve resource allocation in multiproject scheduling

From MaRDI portal
Revision as of 03:17, 1 February 2024 by Import240129110113 (talk | contribs) (Created automatically from import240129110113)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Publication:1590045


DOI10.1016/S0377-2217(99)00490-7zbMath0990.90057MaRDI QIDQ1590045

Antonio Lova, Concepción Maroto, Pilar Tormos

Publication date: 19 August 2002

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/s0377-2217(99)00490-7


90C57: Polyhedral combinatorics, branch-and-bound, branch-and-cut

90B50: Management decision making, including multiple objectives

90B35: Deterministic scheduling theory in operations research


Related Items

An efficient multi-pass heuristic for project scheduling with constrained resources, Solving Multi-Mode Resource-Constrained Multi-Project Scheduling Problem with Combinatorial Auction Mechanisms, A multi‐agent system for the decentralized resource‐constrained multi‐project scheduling problem, A note on the paper Resource-constraint project scheduling: Notation, classification, models and methods by Bruckner et al, Resource allocation in multi-class dynamic PERT networks with finite capacity, Resource allocation in dynamic PERT networks with finite capacity, A \((\mu ,\, \lambda )\)-coordination mechanism for agent-based multi-project scheduling, A survey of variants and extensions of the resource-constrained project scheduling problem, A heuristic solution framework for the resource constrained (multi-)project scheduling problem with sequence-dependent transfer times, Hybrid genetic algorithm with multiparents crossover for job shop scheduling problems, A learning-based optimization approach to multi-project scheduling, Managing and modelling general resource transfers in (multi-)project scheduling, A fuzzy random resource-constrained scheduling model with~multiple projects and its application to a working procedure in a large-scale water conservancy and hydropower construction project, Augmenting priority rule heuristics with justification and rollout to solve the resource-constrained project scheduling problem, A genetic algorithm for the resource constrained multi-project scheduling problem, Multi-mode resource constrained multi-project scheduling and resource portfolio problem



Cites Work