Two-stage assembly scheduling with batch setup times, time-dependent deterioration, and preventive maintenance activities using meta-heuristic algorithms

From MaRDI portal
Revision as of 06:40, 1 February 2024 by Import240129110113 (talk | contribs) (Created automatically from import240129110113)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Publication:1721321

DOI10.1155/2018/6982631zbMath1427.90147OpenAlexW2905649183MaRDI QIDQ1721321

Xianqiang Yang

Publication date: 8 February 2019

Published in: Mathematical Problems in Engineering (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1155/2018/6982631




Related Items (1)



Cites Work


This page was built for publication: Two-stage assembly scheduling with batch setup times, time-dependent deterioration, and preventive maintenance activities using meta-heuristic algorithms