Optimizing a mineral value chain with market uncertainty using Benders decomposition
From MaRDI portal
Publication:1755250
DOI10.1016/J.EJOR.2018.09.047zbMath1430.90156OpenAlexW2895123429WikidataQ129132976 ScholiaQ129132976MaRDI QIDQ1755250
Barrie R. Nault, Jian Zhang, Roussos Dimitrakopoulos
Publication date: 9 January 2019
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2018.09.047
Management decision making, including multiple objectives (90B50) Transportation, logistics and supply chain management (90B06) Microeconomic theory (price theory and economic markets) (91B24)
Related Items (1)
Cites Work
- Optimizing mining complexes with multiple processing and transportation alternatives: an uncertainty-based approach
- Hybrid robust and stochastic optimization for closed-loop supply chain network design using accelerated Benders decomposition
- Aggregation heuristic for the open-pit block scheduling problem
- Network-flow based algorithms for scheduling production in multi-processor open-pit mines accounting for metal uncertainty
- Modeling and estimating commodity prices: copper prices
- Using aggregation to optimize long-term production planning at an underground mine
- The new Fundamental Tree Algorithm for production scheduling of open pit mines
- Partially ordered knapsack and applications to scheduling
- LP-based disaggregation approaches to solving the open pit mining production scheduling problem with block processing selectivity
- Partitioning procedures for solving mixed-variables programming problems
- An application of branch and cut to open pit mine scheduling
- The Benders decomposition algorithm: a literature review
- A Benders decomposition-based heuristic for a production and outbound distribution scheduling problem with strict delivery constraints
- A diversified tabu search approach for the open-pit mine production scheduling problem with metal uncertainty
- Optimizing Long-Term Production Plans in Underground and Open-Pit Copper Mines
- A Decomposition-Based Heuristic for Collaborative Scheduling in a Network of Open-Pit Mines
- A Priori and A Posteriori Aggregation Procedures to Reduce Model Size in MIP Mine Planning Models
- A New Algorithm for the Open-Pit Mine Production Scheduling Problem
This page was built for publication: Optimizing a mineral value chain with market uncertainty using Benders decomposition