Scheduling of resource-constrained projects

From MaRDI portal
Revision as of 10:40, 1 February 2024 by Import240129110113 (talk | contribs) (Created automatically from import240129110113)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Publication:1819247

zbMath0949.90042MaRDI QIDQ1819247

Yanyan Li

Publication date: 6 January 2000

Published in: Operations Research/Computer Science Interfaces Series (Search for Journal in Brave)






Related Items (26)

Multi-mode resource constrained project scheduling problem along with contractor selectionMIP models for resource-constrained project scheduling with flexible resource profilesAn integer programming approach to the multimode resource-constrained multiproject scheduling problemScheduling resource-constrained projects with a flexible project structureOptimal product line pricing in the presence of budget-constrained consumersModels and solution procedures for the resource-constrained project scheduling problem with general temporal constraints and calendarsSolving resource-constrained project scheduling problems: conceptual validation of FLP formulation and efficient permutation-based ABC computationMulti-objectives tabu search based algorithm for progressive resource allocationData-dependency graph transformations for instruction schedulingThe Resource Constrained Project Scheduling Problem: A theoretical comparison between a recent formulation and the main time indexed linear programming based approachesMethods to solve multi-skill project scheduling problemTri-directional scheduling scheme: theory and computationOn the strength of time-indexed formulations for the resource-constrained project scheduling problemScheduling tests in automotive R\&D projectsMixed-integer linear programming and constraint programming formulations for solving resource availability cost problemsA Benders' decomposition algorithm with combinatorial cuts for the multi-manned assembly line balancing problemFirst Results on Resource-Constrained Project Scheduling with Model-Endogenous Decision on the Project StructureJustification and RCPSP: a technique that paysA survey of hybrid metaheuristics for the resource-constrained project scheduling problemA Branch-and-Bound method for solving Multi-Skill Project Scheduling ProblemMaximising the weighted number of activity execution modes in project planningA heuristic solution framework for the resource constrained (multi-)project scheduling problem with sequence-dependent transfer timesA bidirectional heuristic for maximizing the net present value of large-scale projects subject to limited resourcesBalancing assembly lines with variable parallel workplaces: problem definition and effective solution procedureBidirectional planning: Improving priority rule-based heuristics for scheduling resource-constrained projectsOn a fix-and-relax framework for a class of project scheduling problems







This page was built for publication: Scheduling of resource-constrained projects