A revised critical path method for networks including both overlap relationships and variable-duration activities
From MaRDI portal
Publication:2366081
DOI10.1016/0377-2217(93)90179-QzbMath0825.90538MaRDI QIDQ2366081
Robert C. Leachman, Soo-Young Kim
Publication date: 29 June 1993
Published in: European Journal of Operational Research (Search for Journal in Brave)
90B35: Deterministic scheduling theory in operations research
90-08: Computational methods for problems pertaining to operations research and mathematical programming
Related Items
Cites Work
- Unnamed Item
- Critical-Path Planning and Scheduling: Mathematical Basis
- Multiple resource leveling in construction systems through variation of activity intensities
- Project Scheduling with Discrete and Continuous Resources
- Project Scheduling with Continuously-Divisible, Doubly Constrained Resources
- Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case
- Time-Optimal Control of Resource Allocation in a Complex of Operations Framework