Scheduling and staffing multiple projects with a multi-skilled workforce

From MaRDI portal
Revision as of 19:35, 2 February 2024 by Import240129110113 (talk | contribs) (Created automatically from import240129110113)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Publication:2379671


DOI10.1007/s00291-009-0169-4zbMath1183.90172MaRDI QIDQ2379671

Rainer Kolisch, Christian Heimerl

Publication date: 19 March 2010

Published in: OR Spectrum (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1007/s00291-009-0169-4


90B35: Deterministic scheduling theory in operations research

90B80: Discrete location and assignment


Related Items

Preemptive multi-skilled resource constrained project scheduling problem with hard/soft interval due dates, A classification scheme for integrated staff rostering and scheduling problems, Tabu search for proactive project scheduling problem with flexible resources, An exact algorithm for an integrated project staffing problem with a homogeneous workforce, Workforce planning incorporating skills: state of the art, Project scheduling with flexible resources: formulation and inequalities, Branch-and-price approach for the multi-skill project scheduling problem, Optimal dynamic portfolio selection for projects under a competence development model, Stable multi-skill workforce assignments, Multi-objective decision analysis for competence-oriented project portfolio selection, A survey of variants and extensions of the resource-constrained project scheduling problem, Minimizing average project team size given multi-skilled workers with heterogeneous skill levels, A biased random-key genetic algorithm for the project scheduling problem with flexible resources, Resource constrained routing and scheduling: review and research prospects, Competence-based estimation of activity duration in IT projects, A column generation approach for the integrated shift and task scheduling problem of logistics assistants in hospitals, A column generation-based diving heuristic to solve the multi-project personnel staffing problem with calendar constraints and resource sharing, A new algorithm for resource-constrained project scheduling with breadth and depth of skills, Meta-heuristic solution with considering setup time for multi-skilled project scheduling problem, Optimizing temporary work and overtime in the time cost quality trade-off problem, Determining personnel promotion policies in HEI, The bilevel optimisation of a multi-agent project scheduling and staffing problem, Model and algorithm for human resource-constrained R\&D program scheduling optimization, A resource type analysis of the integrated project scheduling and personnel staffing problem, An improved MIP-based approach for a multi-skill workforce scheduling problem, Multi-project scheduling problem under shared multi-skill resource constraints, A heuristic approach to project staffing, An efficient metaheuristic for integrated scheduling and staffing IT projects based on a generalized minimum cost flow network, Bi-objective project portfolio selection and staff assignment under uncertainty



Cites Work