Skilled workforce scheduling in service centres
From MaRDI portal
Publication:954927
DOI10.1016/j.ejor.2007.11.008zbMath1180.90141OpenAlexW2026455393MaRDI QIDQ954927
Ángeles Pérez, Vicente Valls, M. Sacramento Quintanilla
Publication date: 18 November 2008
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2007.11.008
Deterministic scheduling theory in operations research (90B35) Queues and service in operations research (90B22)
Related Items (20)
Robust competence assessment for job assignment ⋮ Scheduling and staffing multiple projects with a multi-skilled workforce ⋮ Workforce planning incorporating skills: state of the art ⋮ Models and solution procedures for the resource-constrained project scheduling problem with general temporal constraints and calendars ⋮ Controllable processing times in project and production management: analysing the trade-off between processing times and the amount of resources ⋮ Solving a multi-objective multi-skilled manpower scheduling model by a fuzzy goal programming approach ⋮ Project scheduling with finite or infinite number of activity processing modes -- a survey ⋮ A classification and new benchmark instances for the multi-skilled resource-constrained project scheduling problem ⋮ Operating room planning and surgical case scheduling: a review of literature ⋮ Resource leveling in a machine environment ⋮ An improved MIP-based approach for a multi-skill workforce scheduling problem ⋮ A mathematical model for the management of a service center ⋮ Time and work generalised precedence relationships in project scheduling with pre-emption: an application to the management of service centres ⋮ Multi-project scheduling problem under shared multi-skill resource constraints ⋮ Staff assignment with lexicographically ordered acceptance levels ⋮ A column generation approach for the integrated shift and task scheduling problem of logistics assistants in hospitals ⋮ A combinatorial Benders decomposition algorithm for parallel machine scheduling with working-time restrictions ⋮ A new algorithm for resource-constrained project scheduling with breadth and depth of skills ⋮ Piecewise linear model for multiskilled workforce scheduling problems considering learning effect and project quality ⋮ Stable multi-skill workforce assignments
Cites Work
- Metaheuristics in combinatorial optimization
- Machine scheduling with availability constraints
- An exact algorithm for project scheduling with multiple modes
- Staff scheduling and rostering: a review of applications, methods and models.
- A genetic algorithm for scheduling staff of mixed skills under multi-criteria
- A survey of the state-of-the-art of common due date assignment and scheduling research
- The multi-mode resource-constrained project scheduling problem with generalized precedence relations
- A branch-and-bound procedure for the multi-mode resource-constrained project scheduling problem with minimum and maximum time lags
- Using metaheuristics in multiobjective resource constrained project scheduling
- Multicriteria scheduling problems: a survey
- Resource-constrained project scheduling: A heuristic for the multi-mode case
- Project scheduling with multiple modes: A genetic algorithm
- An exact procedure for the resource-constrained weighted earliness-tardiness project scheduling problem
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
This page was built for publication: Skilled workforce scheduling in service centres