Cyclic flowshop scheduling with operators and robots: Vyacheslav Tanaev's vision and lasting contributions
From MaRDI portal
Publication:2434294
DOI10.1007/s10951-010-0221-xzbMath1280.90054OpenAlexW2039948945MaRDI QIDQ2434294
Publication date: 5 February 2014
Published in: Journal of Scheduling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10951-010-0221-x
Deterministic scheduling theory in operations research (90B35) Artificial intelligence for robotics (68T40)
Cites Work
- A faster polynomial algorithm for 2-cyclic robotic scheduling
- Identical part production in cyclic robotic cells: Concepts, overview and open questions
- Periodic schedules for linear precedence constraints
- Multi-degree cyclic scheduling of a no-wait robotic cell with multiple robots
- Minimal quantity of operators for serving a homogeneous linear technological process
- Parametric shortest path algorithms with an application to cyclic staffing
- A characterization of the minimum cycle mean in a digraph
- An improved algorithm for cyclic flowshop scheduling in a robotic cell
- A study of the cyclic scheduling problem on parallel processors
- Cyclic scheduling in a robotic production line
- Minimizing the number of robots to meet a given cyclic schedule
- A strongly polynomial algorithm for no-wait cyclic robotic flowshop scheduling
- Scheduling no-wait robotic cells with two and three machines
- A polynomial algorithm for no-wait cyclic hoist scheduling in an extended electroplating line
- A polynomial algorithm for 2-degree cyclic robot scheduling
- Throughput optimization in robotic cells
- An efficient algorithm for multi-hoist cyclic scheduling with fixed processing times
- A branch and bound algorithm for optimal cyclic scheduling in a robotic cell with processing time windows
- Optimal cyclic scheduling of a hoist and multi-type parts with fixed processing times
- Combinatorial Optimization with Rational Objective Functions
- Performance Measures and Schedules in Periodic Job Shops
- An Efficient Optimal Solution to the Two-Hoist No-Wait Cyclic Scheduling Problem
- Dominance of Cyclic Solutions and Challenges in the Scheduling of Robotic Cells