Optimal Scheduling of Products with Two Subassemblies on a Single Machine

From MaRDI portal
Revision as of 16:52, 5 February 2024 by Import240129110113 (talk | contribs) (Created automatically from import240129110113)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Publication:3826355

DOI10.1287/opre.37.3.426zbMath0672.90075OpenAlexW2054029998MaRDI QIDQ3826355

Ardavan Nozari, Mihalis Yannakakis, Edward G. jun. Coffman

Publication date: 1989

Published in: Operations Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1287/opre.37.3.426




Related Items

Triangle structure diagrams for a single machine batching problem with identical jobsOne-machine batching and sequencing of multiple-type itemsOptimal single machine scheduling of products with components and changeover costScheduling with batching: Minimizing the weighted number of tardy jobsSingle machine scheduling with batch-dependent setup timesUnnamed ItemBatch delivery scheduling with batch delivery cost on a single machineBatch scheduling of identical jobs with controllable processing timesSingle machine lot scheduling with non-uniform lot capacities and processing timesA note on a single-machine lot scheduling problem with indivisible ordersCustomer order scheduling on a single machine with family setup times: complexity and algorithmsAn iterative approach for the serial batching problem with parallel machines and job familiesOn-line machine scheduling with batch setupsScheduling parallel machines for the customer order problemA note on batch scheduling on a two-machine flowshop with machine-dependent processing timesLot scheduling on a single machineScheduling with batching: A reviewScheduling the production of two-component jobs on a single machineForming and scheduling jobs with capacitated containers in semiconductor manufacturing: Single machine problemA single machine batch scheduling problem with bounded batch sizeA polynomial algorithm for a one machine batching problemOptimal scheduling of two-component products on a single facilityPreemptive multiprocessor order scheduling to minimize total weighted flowtimeMinimizing flow-time on a single machine with integer batch sizesTwo-machine flowshop batching and schedulingFabrication scheduling on a single machine to minimize the weighted sum of product completion timeThe complexity of customer order scheduling problems on parallel machinesFabrication scheduling on a single machine with due date constraintsScheduling with batching: Two job typesBatch sizing and job sequencing on a single machineA BATCHING PROBLEM WITH LEARNING EFFECT CONSIDERATIONSSingle machine scheduling with batch deliveriesScheduling with agreeable release times and due dates on a batch processing machineEconomic scheduling of products with \(N\) components on a single machineSequencing jobs for an automated manufacturing module with bufferParallel machine batching and scheduling with deadlinesBatch scheduling and common due-date assignment on a single machineThe complexity of one-machine batching problems