Flow-shop scheduling with setup and assembly operations
From MaRDI portal
Recommendations
- Scheduling for two-stage production system with setup and assembly operations
- Minimizing production flow time in a process and assembly job shop
- Three-stage flow-shop scheduling with assembly operations to minimize the weighted sum of product completion times
- Scheduling for fabrication and assembly in a two-machine flowshop with a fixed job sequence
- A branch and bound algorithm for hybrid flow shop scheduling problem with setup time and assembly operations
Cites work
- A branch and bound algorithm for the two-stage assembly scheduling problem
- A survey of scheduling problems with setup times or costs
- Genetic algorithms and simulated annealing for scheduling in agile manufacturing
- scientific article; zbMATH DE number 3754389 (Why is no real title available?)
- scientific article; zbMATH DE number 3639144 (Why is no real title available?)
- Minimizing production flow time in a process and assembly job shop
- Minimizing the Makespan in the 3-Machine Assembly-Type Flowshop Scheduling Problem
- On general routing problems
- Scheduling in dynamic assembly job-shops with jobs having different holding and tardiness costs
- The Two-Stage Assembly Scheduling Problem: Complexity and Approximation
- Three-stage flow-shop scheduling with assembly operations to minimize the weighted sum of product completion times
Cited in
(11)- Deterministic assembly scheduling problems: a review and classification of concurrent-type scheduling models and solution procedures
- Scheduling for two-stage production system with setup and assembly operations
- A branch and bound algorithm for hybrid flow shop scheduling problem with setup time and assembly operations
- Optimization study of three-stage assembly flowshop problem in pharmacy automation dispensing systems
- Multi-objective optimisation in flexible assembly job shop scheduling using a distributed ant colony system
- A survey of scheduling problems with setup times or costs
- scientific article; zbMATH DE number 3852771 (Why is no real title available?)
- Minimizing production flow time in a process and assembly job shop
- Flowshop with additional resources during setups: mathematical models and a GRASP algorithm
- A joint scheduling approach for production and material handling under customized manufacturing paradigm
- The production scheduling problem in a multi-page invoice printing system
This page was built for publication: Flow-shop scheduling with setup and assembly operations
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2467263)