Marc E. Posner

From MaRDI portal
Person:173864

Available identifiers

zbMath Open posner.marc-eMaRDI QIDQ173864

List of research outcomes





PublicationDate of PublicationType
Online production planning to maximize the number of on-time orders2021-05-05Paper
Preemptive parallel-machine scheduling problem of maximizing the number of on-time jobs2020-03-06Paper
Erratum to: ``Flow shops with WIP and value added costs2015-07-28Paper
Sensitivity analysis for scheduling problems2015-01-22Paper
A large class of facets for the \(K\)-median polytope2011-06-17Paper
Online Scheduling with Known Arrival Times2011-04-27Paper
The Generation of Experimental Data for Computational Testing in Optimization2010-12-22Paper
Flow shops with WIP and value added costs2010-05-07Paper
Performance Prediction and Preselection for Optimization and Heuristic Solution Procedures2009-08-13Paper
Generating Experimental Data for Computational Testing with Machine Scheduling Applications2009-07-03Paper
Sensitivity analysis for scheduling problems2007-12-20Paper
Allocation of jobs and identical resources with two pooling centers2007-06-14Paper
Scheduling parallel machines for the customer order problem2007-05-15Paper
Polyhedral properties of the \(K\)-median problem on a tree2007-05-10Paper
The complexity of cyclic shop scheduling problems2002-08-08Paper
High Multiplicity in Earliness-Tardiness Scheduling2002-06-04Paper
Scheduling with finite capacity input buffers2002-03-18Paper
Scheduling with finite capacity output buffers2002-02-07Paper
Parallel machine scheduling with high multiplicity2001-04-24Paper
Preemptive scheduling with finite capacity input buffers1997-12-04Paper
Performance Measures and Schedules in Periodic Job Shops1997-11-25Paper
Approximation Procedures for the One-Warehouse Multi-Retailer System1995-10-09Paper
An NP-Hard Open Shop Scheduling Problem with Polynomial Average Time Complexity1993-06-29Paper
Scheduling with release dates on a single machine to minimize total weighted completion time1992-09-27Paper
Earliness-Tardiness Scheduling Problems, I: Weighted Deviation of Completion Times About a Common Due Date1992-06-28Paper
Reducibility among single machine weighted completion time scheduling problems1990-01-01Paper
The Single Machine Problem with a Quadratic Cost Function of Completion Times1988-01-01Paper
The Deadline Constrained Weighted Completion Time Problem: Analysis of a Heuristic1988-01-01Paper
A dual approach for the continuous collapsing knapsack problem1987-01-01Paper
On optimal decision rules for signs of parameters1986-01-01Paper
A Sequencing Problem with Release Dates and Clustered Jobs1986-01-01Paper
Minimizing Weighted Completion Times with Deadlines1985-01-01Paper
Transshipment along a single road1985-01-01Paper
The Caterer Problem1985-01-01Paper
The tridiagonal transportation problem1984-01-01Paper
A Transportation Type Aggregate Production Model with Backordering1983-01-01Paper
The continuous collapsing Knapsack problem1983-01-01Paper
Linear max-min programming1981-01-01Paper
The Collapsing 0–1 Knapsack Problem1978-01-01Paper
A note on a programming problem with maximin objective function1978-01-01Paper
The decomposition of nonlinear problems1978-01-01Paper

Research outcomes over time

This page was built for person: Marc E. Posner