Publication | Date of Publication | Type |
---|
Structural insights about avoiding transfers in the patient-to-room assignment problem | 2024-02-27 | Paper |
One transfer per patient suffices: structural insights about patient-to-room assignment | 2023-08-03 | Paper |
The blocks relocation problem with item families minimizing the number of reshuffles | 2023-07-25 | Paper |
The gain of robustness for a storage loading problem | 2021-12-03 | Paper |
Solution approaches for storage loading problems with stacking constraints | 2021-05-21 | Paper |
The exponential multi-insertion neighborhood for the vehicle routing problem with unit demands | 2021-04-20 | Paper |
Robust optimization for premarshalling with uncertain priority classes | 2020-06-17 | Paper |
The parallel stack loading problem minimizing the number of reshuffles in the retrieval stage | 2019-10-15 | Paper |
A neutrality-based iterated local search for shift scheduling optimization and interactive reoptimization | 2019-07-05 | Paper |
Trade-off between robustness and cost for a storage loading problem: rule-based scenario generation | 2019-03-14 | Paper |
Flow shop scheduling with flexible processing times | 2018-11-12 | Paper |
https://portal.mardi4nfdi.de/entity/Q4553432 | 2018-11-02 | Paper |
Synchronous flow shop scheduling with pliable jobs | 2018-07-25 | Paper |
MIP-based approaches for robust storage loading problems with stacking constraints | 2018-07-11 | Paper |
Decomposition algorithms for synchronous flow shop problems with additional resources and setup times | 2018-05-25 | Paper |
Solution algorithms for synchronous flow shop problems with two dominating machines | 2016-11-17 | Paper |
Tabu search and lower bounds for a combined production-transportation problem | 2016-11-14 | Paper |
A note on ``Event-based MILP models for resource-constrained project scheduling problems | 2016-11-14 | Paper |
Modeling and optimizing the evacuation of hospitals based on the MRCPSP with resource transfers | 2016-11-11 | Paper |
Complexity results for storage loading problems with stacking constraints | 2016-10-07 | Paper |
Robust storage loading problems with stacking and payload constraints | 2016-10-07 | Paper |
Complexity results for flow shop problems with synchronous movement | 2016-07-08 | Paper |
Loading, unloading and premarshalling of stacks in storage areas: survey and classification | 2016-06-24 | Paper |
A flow-based tabu search algorithm for the RCPSP with transfer times | 2016-05-04 | Paper |
The bottleneck transportation problem with auxiliary resources | 2015-09-17 | Paper |
A classification scheme for integrated staff rostering and scheduling problems | 2015-04-27 | Paper |
Robust load planning of trains in intermodal transportation | 2014-12-11 | Paper |
Integrated production and distribution scheduling with lifespan constraints | 2014-09-26 | Paper |
In memoriam Peter Brucker | 2014-08-18 | Paper |
„Diskret“ optimierte Pläne im Alltag | 2012-10-01 | Paper |
Optimized load planning of trains in intermodal transportation | 2012-08-13 | Paper |
Parallel batch scheduling of equal-length jobs with release and due dates | 2010-11-03 | Paper |
Constructing fair sports league schedules with regard to strength groups | 2010-05-05 | Paper |
Scheduling non-professional table-tennis leagues | 2009-12-14 | Paper |
Scheduling in sports: an annotated bibliography | 2009-10-16 | Paper |
Minimizing costs in round robin tournaments with place constraints | 2009-06-18 | Paper |
Scheduling sports tournaments on a single court minimizing waiting times | 2009-03-04 | Paper |
Complex Scheduling | 2008-07-10 | Paper |
Balanced home-away assignments | 2007-02-20 | Paper |
Scheduling chains with identical jobs and constant delays on a single machine | 2006-08-18 | Paper |
Complexity results for flow-shop problems with a single server | 2005-04-21 | Paper |
Tabu search algorithms for job-shop problems with a single transport robot | 2005-02-09 | Paper |
Ten notes on equal-processing-time scheduling: at the frontiers of solvability in polynomial time | 2004-10-28 | Paper |
Complexity results for flow-shop and open-shop scheduling problems with transportation delays | 2004-08-10 | Paper |
Scheduling UET task systems with concurrency on two parallel identical processors | 2003-08-18 | Paper |
Lower bounds for resource-constrained project scheduling problems. | 2003-07-30 | Paper |
A polynomial algorithm for \(P | p_j = 1,r_j, outtree\,| \sum C_j\) | 2003-06-23 | Paper |
Complexity results for parallel machine problems with a single server | 2003-02-23 | Paper |
Lower bounds for scheduling a single robot in a job-shop environment | 2003-01-27 | Paper |
A linear programming and constraint propagation-based lower bound for the RCPSP | 2002-08-26 | Paper |
List scheduling in a parallel machine environment with precedence constraints and setup times | 2002-07-03 | Paper |
A tabu search algorithm for scheduling a single robot in a job-shop environment | 2002-06-24 | Paper |
Scheduling railway traffic at a construction site | 2002-05-30 | Paper |
https://portal.mardi4nfdi.de/entity/Q2779816 | 2002-04-15 | Paper |
A branch and bound algorithm for the resource-constrained project scheduling problem | 2001-10-21 | Paper |
Makespan minimization for flow-shop problems with transportation times and a single robot | 2001-10-16 | Paper |
https://portal.mardi4nfdi.de/entity/Q4495168 | 2001-01-04 | Paper |
Complexity results for single-machine problems with positive finish-start time-lags | 2000-03-16 | Paper |
https://portal.mardi4nfdi.de/entity/Q3836185 | 1999-12-06 | Paper |