Heuristics for a two-stage hybrid flowshop scheduling problem with ready times and a product-mix ratio constraint

From MaRDI portal
Publication:1009206


DOI10.1007/s10732-007-9061-zzbMath1180.90127MaRDI QIDQ1009206

Yeong-Dae Kim, Byung-Jun Joo, Jong-Ho Shin

Publication date: 31 March 2009

Published in: Journal of Heuristics (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1007/s10732-007-9061-z


90B35: Deterministic scheduling theory in operations research

90C59: Approximation methods and heuristics in mathematical programming


Related Items



Cites Work