Project scheduling with inventory constraints
From MaRDI portal
Publication:1812299
DOI10.1007/s001860200251zbMath1064.90018OpenAlexW2084967063MaRDI QIDQ1812299
Christoph Schwindt, Klaus Neumann
Publication date: 23 June 2003
Published in: Mathematical Methods of Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s001860200251
Polyhedral combinatorics, branch-and-bound, branch-and-cut (90C57) Deterministic scheduling theory in operations research (90B35) Inventory, storage, reservoirs (90B05)
Related Items (30)
Relocation scheduling subject to fixed processing sequences ⋮ Scheduling the production of rolling ingots: industrial context, model, and solution method ⋮ On the integration of diverging material flows into resource-constrained project scheduling ⋮ Simple heuristics for scheduling with limited intermediate storage ⋮ Order acceptance with weighted tardiness ⋮ Minimizing makespan on a single machine with release dates and inventory constraints ⋮ Exact algorithms for inventory constrained scheduling on a single machine ⋮ Approximation schemes for single machine scheduling with non-renewable resource constraints ⋮ Lower bounds for the event scheduling problem with consumption and production of resources ⋮ Hybrid differential evolution algorithm for the resource constrained project scheduling problem with a flexible project structure and consumption and production of resources ⋮ Approximation schemes for parallel machine scheduling with non-renewable resources ⋮ The allocation of storage space for transshipment in vehicle distribution ⋮ Approximation algorithms for inventory constrained scheduling on a single machine ⋮ A fuzzy random resource-constrained scheduling model with~multiple projects and its application to a working procedure in a large-scale water conservancy and hydropower construction project ⋮ Scheduling of inventory releasing jobs to minimize a regular objective function of delivery times ⋮ Dismantling of nuclear power plants at optimal NPV ⋮ Reductions between scheduling problems with non-renewable resources and knapsack problems ⋮ Time symmetry of resource constrained project scheduling with general temporal constraints and take-give resources ⋮ Scheduling tests in automotive R\&D projects ⋮ Capital- and resource-constrained project scheduling with net present value optimization ⋮ The project scheduling problem with production and consumption of resources: a list-scheduling based algorithm ⋮ Time-constrained project scheduling with adjacent resources ⋮ Scheduling of continuous and discontinuous material flows with intermediate storage restrictions ⋮ Continuous filling and emptying of storage systems in constraint-based scheduling ⋮ A cyclic approach to large-scale short-term planning in chemical batch production ⋮ A scheduling system for the steelmaking-continuous casting process. A case study from the steel-making industry ⋮ A survey of variants and extensions of the resource-constrained project scheduling problem ⋮ Complexity of single machine scheduling subject to nonnegative inventory constraints ⋮ Approximability of scheduling problems with resource consuming jobs ⋮ Algorithms for propagating resource constraints in AI planning and scheduling: Existing approaches and new results
This page was built for publication: Project scheduling with inventory constraints