Project scheduling with inventory constraints

From MaRDI portal
Publication:1812299

DOI10.1007/s001860200251zbMath1064.90018OpenAlexW2084967063MaRDI QIDQ1812299

Christoph Schwindt, Klaus Neumann

Publication date: 23 June 2003

Published in: Mathematical Methods of Operations Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1007/s001860200251




Related Items (30)

Relocation scheduling subject to fixed processing sequencesScheduling the production of rolling ingots: industrial context, model, and solution methodOn the integration of diverging material flows into resource-constrained project schedulingSimple heuristics for scheduling with limited intermediate storageOrder acceptance with weighted tardinessMinimizing makespan on a single machine with release dates and inventory constraintsExact algorithms for inventory constrained scheduling on a single machineApproximation schemes for single machine scheduling with non-renewable resource constraintsLower bounds for the event scheduling problem with consumption and production of resourcesHybrid differential evolution algorithm for the resource constrained project scheduling problem with a flexible project structure and consumption and production of resourcesApproximation schemes for parallel machine scheduling with non-renewable resourcesThe allocation of storage space for transshipment in vehicle distributionApproximation algorithms for inventory constrained scheduling on a single machineA fuzzy random resource-constrained scheduling model with~multiple projects and its application to a working procedure in a large-scale water conservancy and hydropower construction projectScheduling of inventory releasing jobs to minimize a regular objective function of delivery timesDismantling of nuclear power plants at optimal NPVReductions between scheduling problems with non-renewable resources and knapsack problemsTime symmetry of resource constrained project scheduling with general temporal constraints and take-give resourcesScheduling tests in automotive R\&D projectsCapital- and resource-constrained project scheduling with net present value optimizationThe project scheduling problem with production and consumption of resources: a list-scheduling based algorithmTime-constrained project scheduling with adjacent resourcesScheduling of continuous and discontinuous material flows with intermediate storage restrictionsContinuous filling and emptying of storage systems in constraint-based schedulingA cyclic approach to large-scale short-term planning in chemical batch productionA scheduling system for the steelmaking-continuous casting process. A case study from the steel-making industryA survey of variants and extensions of the resource-constrained project scheduling problemComplexity of single machine scheduling subject to nonnegative inventory constraintsApproximability of scheduling problems with resource consuming jobsAlgorithms for propagating resource constraints in AI planning and scheduling: Existing approaches and new results




This page was built for publication: Project scheduling with inventory constraints