Robust berth scheduling at marine container terminals via hierarchical optimization
DOI10.1016/J.COR.2013.07.018zbMATH Open1348.90263OpenAlexW2058600738MaRDI QIDQ336840FDOQ336840
Authors: Mihalis Golias, Isabel Portal, Dinçer Konur, Evangelos Kaisar, Georgios Kolomvos
Publication date: 10 November 2016
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2013.07.018
Recommendations
- Robust berth scheduling with uncertain vessel delay and handling time
- A proactive approach for simultaneous berth and quay crane scheduling problem with stochastic arrival and handling time
- A decision model for berth allocation under uncertainty considering service level using an adaptive differential evolution algorithm
- An exact robust approach for the integrated berth allocation and quay crane scheduling problem under uncertain arrival times
- Tactical berth allocation under uncertainty
Multi-objective and goal programming (90C29) Approximation methods and heuristics in mathematical programming (90C59) Deterministic scheduling theory in operations research (90B35)
Cites Work
Cited In (28)
- Repositioning with unreliable carriers: the case of marine chassis equipment at container ports
- Collaborative emergency berth scheduling based on decentralized decision and price mechanism
- An integrated model for berth and yard planning in container terminals with multi-continuous berth layout
- Title not available (Why is that?)
- Solving a stochastic berth allocation problem using a hybrid sequence pair-based simulated annealing algorithm
- Scheduling ships movements within a canal harbor
- A solution framework for the integrated periodic supply vessel planning and port scheduling in oil and gas supply logistics
- A tabu search algorithm for the integrated scheduling problem of container handling systems in a maritime terminal
- Improving the adaptability in automated vessel scheduling in container ports using intelligent software agents
- Robust multistage yard crane scheduling in container terminals
- A sample average approximation approach to the berth allocation problem with uncertain tides
- A follow-up survey of berth allocation and quay crane scheduling problems in container terminals
- Optimal policies for the berth allocation problem under stochastic nature
- A decision model for berth allocation under uncertainty considering service level using an adaptive differential evolution algorithm
- Nonlinear mathematical programming for optimal management of container terminals
- Multi-objective and prioritized berth allocation in container ports
- Metaheuristic approaches for the berth allocation problem
- Robust berth scheduling with uncertain vessel delay and handling time
- Robust cyclic berth planning of container vessels
- A solution framework for the integrated periodic supply vessel planning and port scheduling in oil and gas supply logistics
- Title not available (Why is that?)
- A quantitative analysis of container vessel arrival planning strategies
- Proactive berth scheduling with data-driven buffer time in container terminals
- Berth allocation and quay crane assignment/scheduling problem under uncertainty: a survey
- An exact robust approach for the integrated berth allocation and quay crane scheduling problem under uncertain arrival times
- The synergistic effect of operational research and big data analytics in greening container terminal operations: a review and future directions
- Integrated proactive-reactive approach and a hybrid adaptive large neighborhood search algorithm for berth and quay crane scheduling under uncertain combination
- Robust optimization for the integrated berth allocation and quay crane assignment problem
This page was built for publication: Robust berth scheduling at marine container terminals via hierarchical optimization
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q336840)