A proactive approach for simultaneous berth and quay crane scheduling problem with stochastic arrival and handling time
DOI10.1016/J.EJOR.2010.07.018zbMATH Open1206.90012OpenAlexW2058374293MaRDI QIDQ613450FDOQ613450
Xiaole Han, Lifeng Xi, Zhiqiang Lu
Publication date: 20 December 2010
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2010.07.018
Recommendations
- An exact robust approach for the integrated berth allocation and quay crane scheduling problem under uncertain arrival times
- Integrated proactive-reactive approach and a hybrid adaptive large neighborhood search algorithm for berth and quay crane scheduling under uncertain combination
- Berth allocation and quay crane assignment/scheduling problem under uncertainty: a survey
- Simultaneous Optimization of Berth Allocation, Quay Crane Assignment and Quay Crane Scheduling Problems in Container Terminals
- Robust scheduling for berth allocation and quay crane assignment problem
- Optimal berth allocation, time-variant quay crane assignment and scheduling with crane setups in container terminals
- MIP approaches for the integrated berth allocation and quay crane assignment and scheduling problem
- New exact methods for the time-invariant berth allocation and quay crane assignment problem
Approximation methods and heuristics in mathematical programming (90C59) Deterministic scheduling theory in operations research (90B35) Transportation, logistics and supply chain management (90B06)
Cites Work
- A survey of berth allocation and quay crane scheduling problems in container terminals
- Container terminal operation and operations research -- a classification and literature review
- Transshipment of containers at a container terminal: An overview
- Executing production schedules in the face of uncertainties: a review and some future directions
- A scheduling method for Berth and Quay cranes
- Forecasting policies for scheduling a stochastic due date job shop
Cited In (25)
- An integrated berth allocation and yard assignment problem for bulk ports: Formulation and case study
- Metaheuristic approaches for the Berth Allocation Problem
- Solving a stochastic berth allocation problem using a hybrid sequence pair-based simulated annealing algorithm
- Improved sequential insertion heuristics for berth allocation problems
- Improving the adaptability in automated vessel scheduling in container ports using intelligent software agents
- Proactive and reactive strategies for football league timetabling
- A follow-up survey of berth allocation and quay crane scheduling problems in container terminals
- Tactical berth allocation under uncertainty
- Optimal policies for the berth allocation problem under stochastic nature
- Hybrid evolutionary computation methods for quay crane scheduling problems
- Robust berth scheduling at marine container terminals via hierarchical optimization
- Berth assignment for liner carrier clusters under a cooperative environment
- Simultaneous Allocation of Berths and Quay Cranes under Discrete Berth Situation
- MIP approaches for the integrated berth allocation and quay crane assignment and scheduling problem
- Robust scheduling for berth allocation and quay crane assignment problem
- Real-time management of berth allocation with stochastic arrival and handling times
- A Decision Model for Berth Allocation Under Uncertainty Considering Service Level Using an Adaptive Differential Evolution Algorithm
- Proactive berth scheduling with data-driven buffer time in container terminals
- A scheduling method for Berth and Quay cranes
- A dynamic and flexible berth allocation model with stochastic vessel arrival times
- Berth allocation and quay crane assignment/scheduling problem under uncertainty: a survey
- An exact robust approach for the integrated berth allocation and quay crane scheduling problem under uncertain arrival times
- A branch-and-price algorithm to solve the integrated berth allocation and yard assignment problem in bulk ports
- Integrated proactive-reactive approach and a hybrid adaptive large neighborhood search algorithm for berth and quay crane scheduling under uncertain combination
- Robust optimization for the integrated berth allocation and quay crane assignment problem
This page was built for publication: A proactive approach for simultaneous berth and quay crane scheduling problem with stochastic arrival and handling time
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q613450)