A proactive approach for simultaneous berth and quay crane scheduling problem with stochastic arrival and handling time

From MaRDI portal
Publication:613450

DOI10.1016/j.ejor.2010.07.018zbMath1206.90012OpenAlexW2058374293MaRDI QIDQ613450

Xiao-Le Han, Li-Feng Xi, Zhi-Qiang Lu

Publication date: 20 December 2010

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.ejor.2010.07.018



Related Items

Solving a stochastic berth allocation problem using a hybrid sequence pair-based simulated annealing algorithm, A follow-up survey of berth allocation and quay crane scheduling problems in container terminals, Tactical berth allocation under uncertainty, Optimal policies for the berth allocation problem under stochastic nature, Hybrid evolutionary computation methods for quay crane scheduling problems, Robust berth scheduling at marine container terminals via hierarchical optimization, Berth allocation and quay crane assignment/scheduling problem under uncertainty: a survey, Simultaneous Allocation of Berths and Quay Cranes under Discrete Berth Situation, Berth assignment for liner carrier clusters under a cooperative environment, A Decision Model for Berth Allocation Under Uncertainty Considering Service Level Using an Adaptive Differential Evolution Algorithm, Robust optimization for the integrated berth allocation and quay crane assignment problem, MIP approaches for the integrated berth allocation and quay crane assignment and scheduling problem, Improved sequential insertion heuristics for berth allocation problems, Integrated proactive-reactive approach and a hybrid adaptive large neighborhood search algorithm for berth and quay crane scheduling under uncertain combination, An integrated berth allocation and yard assignment problem for bulk ports: Formulation and case study, Real-time management of berth allocation with stochastic arrival and handling times, Robust scheduling for berth allocation and quay crane assignment problem, An exact robust approach for the integrated berth allocation and quay crane scheduling problem under uncertain arrival times, A branch-and-price algorithm to solve the integrated berth allocation and yard assignment problem in bulk ports, A dynamic and flexible berth allocation model with stochastic vessel arrival times, Proactive and reactive strategies for football league timetabling, Metaheuristic approaches for the Berth Allocation Problem



Cites Work