A parametric procedure for multicriterion sequence scheduling for JustIn-Time mixed-model assembly lines
From MaRDI portal
Publication:4245322
DOI10.1080/002075497194651zbMath0943.90532MaRDI QIDQ4245322
Henry Aigbedo, Yasuhiro Monden
Publication date: 10 September 2000
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/002075497194651
90B30: Production models
Related Items
Production smoothing in just-in-time manufacturing systems: a review of the models and solution approaches, An assessment of the effect of mass customization on suppliers' inventory levels in a JIT supply chain, Balancing and sequencing mixed-model just-in-time \(U\)-lines with multiple objectives, Sequencing mixed-model assembly lines: survey, classification and model critique, A transformed two-stage method for reducing the part-usage variation and a comparison of the product-level and part-level solutions in sequencing mixed-model assembly lines, Controlling mixed-model assembly lines in real-time by using distributed systems, An iterated beam search algorithm for the multi-level production smoothing problem with workload smoothing goal