A parametric procedure for multicriterion sequence scheduling for JustIn-Time mixed-model assembly lines
From MaRDI portal
Publication:4245322
DOI10.1080/002075497194651zbMATH Open0943.90532OpenAlexW2124540069MaRDI QIDQ4245322FDOQ4245322
Authors: Henry Aigbedo, Y. Monden
Publication date: 10 September 2000
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/002075497194651
Recommendations
- Multi-criteria sequencing problem for a mixed-model assembly line in a JIT production system
- Bicriteria sequencing methods for the mixed-model assembly line in just-in-time production systems
- Bicriteria sequencing for just-in-time mixed-model assembly lines
- A simple sequencing algorithm for mixed-model assembly lines in just-in- time production systems
- Sequencing mixed-model assembly lines with demand management: problem development and efficient multi-objective algorithms
- A simulation analysis for two-level sequence-scheduling for just-in-time (JIT) mixed-model assembly lines
- Scheduling just-in-time part supply for mixed-model assembly lines
- Just-in-time sequencing algorithms for mixed-model production systems
- Simultaneous balancing and scheduling of flexible mixed model assembly lines with sequence-dependent setup times
- A comment on ``A simple sequencing algorithm for mixed-model assembly lines in just-in-time production systems
Cited In (15)
- On bills of materials structure and optimum product-level smoothing of parts usage in JIT assembly systems
- Bicriteria sequencing methods for the mixed-model assembly line in just-in-time production systems
- A transformed two-stage method for reducing the part-usage variation and a comparison of the product-level and part-level solutions in sequencing mixed-model assembly lines
- Controlling mixed-model assembly lines in real-time by using distributed systems
- Models for MMSP-W considering workstation dependencies: a case study of Nissan's Barcelona plant
- Sequencing mixed-model assembly lines: survey, classification and model critique
- A bicriterion objective for levelling the schedule of a mixed-model, \(JIT\) assembly process
- Scheduling a single vehicle in the just-in-time part supply for a mixed-model assembly line
- Applying available-to-promise (ATP) concept in mixed-model assembly line sequencing problems in a make-to-order (MTO) environment: problem extension, model formulation and Lagrangian relaxation algorithm
- An iterated beam search algorithm for the multi-level production smoothing problem with workload smoothing goal
- An assessment of the effect of mass customization on suppliers' inventory levels in a JIT supply chain
- Production smoothing in just-in-time manufacturing systems: a review of the models and solution approaches
- Balancing and sequencing mixed-model just-in-time \(U\)-lines with multiple objectives
- Interactive bicriterion decision support for a large scale industrial scheduling system
- Balancing two-sided U-type assembly lines using modified particle swarm optimization algorithm
This page was built for publication: A parametric procedure for multicriterion sequence scheduling for JustIn-Time mixed-model assembly lines
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4245322)