A parametric procedure for multicriterion sequence scheduling for JustIn-Time mixed-model assembly lines
From MaRDI portal
Publication:4245322
DOI10.1080/002075497194651zbMath0943.90532OpenAlexW2124540069MaRDI QIDQ4245322
Yasuhiro Monden, Henry Aigbedo
Publication date: 10 September 2000
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/002075497194651
Related Items (max. 100)
An iterated beam search algorithm for the multi-level production smoothing problem with workload smoothing goal ⋮ An assessment of the effect of mass customization on suppliers' inventory levels in a JIT supply chain ⋮ Balancing and sequencing mixed-model just-in-time \(U\)-lines with multiple objectives ⋮ Production smoothing in just-in-time manufacturing systems: a review of the models and solution approaches ⋮ Balancing two-sided U-type assembly lines using modified particle swarm optimization algorithm ⋮ Models for MMSP-W considering workstation dependencies: a case study of Nissan's Barcelona plant ⋮ On bills of materials structure and optimum product-level smoothing of parts usage in JIT assembly systems ⋮ Sequencing mixed-model assembly lines: survey, classification and model critique ⋮ Controlling mixed-model assembly lines in real-time by using distributed systems ⋮ A transformed two-stage method for reducing the part-usage variation and a comparison of the product-level and part-level solutions in sequencing mixed-model assembly lines ⋮ Interactive bicriterion decision support for a large scale industrial scheduling system
This page was built for publication: A parametric procedure for multicriterion sequence scheduling for JustIn-Time mixed-model assembly lines