Production smoothing in just-in-time manufacturing systems: a review of the models and solution approaches
From MaRDI portal
Publication:5385397
DOI10.1080/00207540701223410zbMATH Open1160.90464OpenAlexW2122147145MaRDI QIDQ5385397FDOQ5385397
Publication date: 6 May 2008
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207540701223410
Recommendations
- Optimizing production smoothing decisions via batch selection for mixed-model just-in-time manufacturing systems with arbitrary setup and processing times
- Analysis and solution to the single-level batch production smoothing problem
- scientific article; zbMATH DE number 1537217
- A simple lot-scheduling model for just-in-time manufacturing
- Level Schedules for Mixed-Model, Just-in-Time Processes
Cites Work
- Balancing and sequencing manual mixed-model assembly lines
- Mixed Model Line Balancing with Smoothed Station Assignments
- Production-Line Balances for Mixed-Model Lines
- Heuristics and exact algorithms for solving the Monden problem
- Minimizing variation of production rates in just-in-time systems: A survey
- A genetic algorithm for multiple objective sequencing problems in mixed model assembly lines.
- A simple sequencing algorithm for mixed-model assembly lines in just-in- time production systems
- A multi-objective genetic algorithm for mixed-model sequencing on JIT assembly lines
- Sequencing JIT Mixed-Model Assembly Lines Under Station-Load and Part-Usage Constraints
- Level Schedules for Mixed-Model Assembly Lines in Just-In-Time Production Systems
- A parametric procedure for multicriterion sequence scheduling for JustIn-Time mixed-model assembly lines
- Balancing Mixed Model Lines with In-Process Inventories
- Controlling mixed-model assembly lines in real-time by using distributed systems
- Level Schedules for Mixed-Model, Just-in-Time Processes
- Optimal level schedules for mixed-model, multi-level just-in-time assembly systems
- Cyclic just-in-time sequences are optimal
- The maximum deviation just-in-time scheduling problem.
- A Note on “Level Schedules for Mixed-Model Assembly Lines in Just-in-Time Production Systems”
- Note—Sequencing JIT Mixed-Model Assembly Lines
- Pattern based vocabulary building for effectively sequencing mixed-model assembly lines
- Developing production schedules which balance part usage and smooth production loads for just-in-time production systems
- A dynamic programming algorithm for scheduling mixed-model, just-in-time production systems
- Using beam search techniques for sequencing mixed-model assembly lines
- Mixed-model assembly line sequencing heuristics for smoothing component parts usage: A comparative analysis
- Title not available (Why is that?)
- Bicriteria sequencing for just-in-time mixed-model assembly lines
- Sequencing problem for a mixed-model assembly line in the Toyota production system
- Optimizing production smoothing decisions via batch selection for mixed-model just-in-time manufacturing systems with arbitrary setup and processing times
- Algorithms for the car sequencing and the level scheduling problem
- Bicriteria sequencing methods for the mixed-model assembly line in just-in-time production systems
- A hybrid meta-heuristic for the batching problem in just-in-time flow shops
- A comparative analysis of sequencing procedures for mixed-model assembly lines in a just-in-time production system
- Evaluating sequences for paced, mixed-model assembly lines with JIT component fabrication
- Revisiting the mixed-model multi-level just-in-time scheduling problem
- Optimal level schedules in mixed-model, multi-level JIT assembly systems with pegging
- Algorithms for Toyota's goal of sequencing mixed models on an assembly line with multiple workstations
- Discussion A note on 'scheduling mixed-model multi-level just-in-time production systems’*
- A Study of Production Smoothing in a Job Shop Environment
Cited In (12)
- On bills of materials structure and optimum product-level smoothing of parts usage in JIT assembly systems
- Balancing and scheduling of flexible mixed model assembly lines
- JIT manufacturing: The evolution to animplementation model founded in current practice
- Level scheduling for batched JIT supply
- Optimizing production smoothing decisions via batch selection for mixed-model just-in-time manufacturing systems with arbitrary setup and processing times
- Just-in-Time Planning and Lot-Sizing
- Stochastic models of simple controlled systems just-in-time
- Advanced constraint propagation for the combined car sequencing and level scheduling problem
- An iterated beam search algorithm for the multi-level production smoothing problem with workload smoothing goal
- A Study of Production Smoothing in a Job Shop Environment
- A multi-objective production smoothing model with compressible operating times
- Earliness--tardiness production planning for just-in-time manufacturing: a unifying approach by goal programming
This page was built for publication: Production smoothing in just-in-time manufacturing systems: a review of the models and solution approaches
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5385397)