Displacement problem and dynamically scheduling aircraft landings
From MaRDI portal
Publication:4661228
DOI10.1057/palgrave.jors.2601650zbMath1095.90562OpenAlexW2022888054MaRDI QIDQ4661228
Yazid M. Sharaiha, David Abramson, Mohan Krishnamoorthy, John E. Beasley
Publication date: 4 April 2005
Published in: Journal of the Operational Research Society (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1057/palgrave.jors.2601650
Management decision making, including multiple objectives (90B50) Deterministic scheduling theory in operations research (90B35) Traffic problems in operations research (90B20)
Related Items
On-line decision support for take-off runway scheduling with uncertain taxi times at London heathrow airport ⋮ Solving the aircraft landing problem with time discretization approach ⋮ An efficient hybrid meta-heuristic for aircraft landing problem ⋮ A rescheduling and cost allocation mechanism for delayed arrivals ⋮ Airport runway scheduling ⋮ Lessons from building an automated pre-departure sequencer for airports ⋮ Order allocation, rack allocation and rack sequencing for pickers in a mobile rack environment ⋮ Scheduling models for air traffic control in terminal areas ⋮ Unnamed Item ⋮ Aircraft landing problems with aircraft classes ⋮ Improved rolling horizon approaches to the aircraft sequencing problem ⋮ Heuristics for flights arrival scheduling at airports ⋮ Dynamic scheduling of aircraft landings ⋮ Scheduling aircraft landings using airlines' preferences ⋮ A quadratic time algorithm for computing the optimal landing times of a fixed sequence of planes ⋮ Applications of stochastic modeling in air traffic management: methods, challenges and opportunities for solving air traffic problems under uncertainty ⋮ Methods for solving of the aircraft landing problem. I: Exact solution methods ⋮ Scatter search and bionomic algorithms for the aircraft landing problem
Uses Software
This page was built for publication: Displacement problem and dynamically scheduling aircraft landings