A constraint-based method for project scheduling with time windows
From MaRDI portal
Publication:5960034
DOI10.1023/A:1013617802515zbMath1048.90103OpenAlexW1866349670MaRDI QIDQ5960034
Stephen F. Smith, Angelo Oddi, Amedeo Cesta
Publication date: 11 April 2002
Published in: Journal of Heuristics (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1023/a:1013617802515
Deterministic scheduling theory in operations research (90B35) Problem solving in the context of artificial intelligence (heuristics, search strategies, etc.) (68T20)
Related Items (18)
Analysis of a parallel machine scheduling problem with sequence dependent setup times and job availability intervals ⋮ A case study of mutual routing-scheduling reformulation ⋮ New concepts for activity float in resource-constrained project management ⋮ Solving job shop scheduling with setup times through constraint-based iterative sampling: an experimental analysis ⋮ Solving RCPSP/max by lazy clause generation ⋮ A min-flow algorithm for minimal critical set detection in resource constrained project scheduling ⋮ An evolutionary algorithm for the resource-constrained project scheduling problem with minimum and maximum time lags ⋮ Time symmetry of resource constrained project scheduling with general temporal constraints and take-give resources ⋮ The project scheduling problem with production and consumption of resources: a list-scheduling based algorithm ⋮ Continuous management of airlift and tanker resources: a constraint-based approach ⋮ A hybrid framework for over-constrained generalized resource-constrained project scheduling problems ⋮ A double genetic algorithm for the MRCPSP/max ⋮ Solve-and-robustify ⋮ Iterative Flattening Search on RCPSP/max Problems: Recent Developments ⋮ A survey of variants and extensions of the resource-constrained project scheduling problem ⋮ Activity list representation for a generalization of the resource-constrained project scheduling problem ⋮ Enhancing stochastic search performance by value-biased randomization of heuristics ⋮ Algorithms for propagating resource constraints in AI planning and scheduling: Existing approaches and new results
Uses Software
This page was built for publication: A constraint-based method for project scheduling with time windows