Scheduling problems with two competing agents to minimize minmax and minsum earliness measures

From MaRDI portal
Publication:976483

DOI10.1016/j.ejor.2010.03.003zbMath1188.90103OpenAlexW2020768508MaRDI QIDQ976483

Baruch Mor, Gur Mosheiov

Publication date: 11 June 2010

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.ejor.2010.03.003




Related Items

Pareto-scheduling of two competing agents with their own equal processing timesProportionate flow shop scheduling with multi-agents to maximize total gains of JIT jobsMulti-agent scheduling in a no-wait flow shop system to maximize the weighted number of just-in-time jobsMultitasking scheduling problems with two competitive agentsA note on scheduling problems with competing agents and earliness minimization objectivesDesign of automated negotiation mechanisms for decentralized heterogeneous machine schedulingTwo-agent scheduling in a flowshopScheduling two job families on a single machine with two competitive agentsScheduling problems with two competing agents to minimized weighted earliness-tardinessAn investigation on a two-agent single-machine scheduling problem with unequal release datesSingle machine scheduling problem with two synergetic agents and piece-rate maintenanceScheduling with two competing agents to minimize total weighted earlinessTwo-agent flowshop scheduling to maximize the weighted number of just-in-time jobsScheduling Two-Agents with a Time-Dependent Deterioration to Minimize the Minsum Earliness MeasuresA time-dependent scheduling problem to minimize the sum of the total weighted tardiness among two agentsA survey of due-date related single-machine with two-agent scheduling problemTwo-Machine and Two-Agent Flow Shop with Special Processing Times StructuresSingle machine batch scheduling with two competing agents to minimize total flowtimeA two-agent single-machine scheduling problem to minimize the total cost with release datesA two-agent single-machine scheduling problem with late work criteriaUnbounded parallel-batching scheduling with two competitive agentsBounded parallel-batching scheduling with two competing agentsScheduling problems with two agents and a linear non-increasing deterioration to minimize earliness penaltiesA competitive two-agent scheduling problem on parallel machines with release dates and preemptionTwo-agent single-machine scheduling of jobs with time-dependent processing times and ready timesScheduling two agents with sum-of-processing-times-based deterioration on a single machineTwo-agent-based single-machine scheduling with switchover time to minimize total weighted completion time and makespan objectivesA just-in-time scheduling problem with two competing agentsTwo competitive agents to minimize the weighted total late work and the total completion timeTwo-agent single-machine scheduling with assignable due datesA common framework and taxonomy for multicriteria scheduling problems with interfering and competing jobs: multi-agent scheduling problemsSolving a two-agent single-machine scheduling problem considering learning effectGroup Scheduling with Two Competing Agents on a Single MachineA honey-bees optimization algorithm for a two-agent single-machine scheduling problem with ready timesA two-agent single machine scheduling problem with due-window assignment and a common flow-allowanceA Branch-and-Bound Algorithm for Two-Agent Scheduling with Learning Effect and Late Work CriterionTwo-agent scheduling on unrelated parallel machines with total completion time and weighted number of tardy jobs criteriaSINGLE MACHINE FAMILY SCHEDULING WITH TWO COMPETING AGENTS TO MINIMIZE MAKESPANSupply chain scheduling in a collaborative manufacturing mode: model construction and algorithm designAn Ordered Flow Shop with Two Agents



Cites Work