The following pages link to A Review of Production Scheduling (Q3916358):
Displaying 50 items.
- Two meta-heuristic algorithms for solving multi-objective flexible job-shop scheduling with parallel machine and maintenance constraints (Q356114) (← links)
- An improved heuristic for parallel machine weighted flowtime scheduling with family set-up times (Q418297) (← links)
- A mixed-integer linear programming approach to the optimization of event-bus schedules: a scheduling application in the tourism sector (Q490386) (← links)
- Performance of the LPT algorithm in multiprocessor scheduling (Q583889) (← links)
- Research on construction and application for the model of multistage job shop scheduling problem (Q782293) (← links)
- Search-based job shop scheduling and sequencing: Extensions to the search sequencing rule (Q908838) (← links)
- Job oriented production scheduling (Q915631) (← links)
- Multi-level production scheduling for a class of flexible machining and assembly systems (Q918393) (← links)
- Coordinated production scheduling for make-to-order manufacturing (Q919989) (← links)
- Modeling realistic hybrid flexible flowshop scheduling problems (Q941540) (← links)
- An improved constraint satisfaction adaptive neural network for job-shop scheduling (Q969749) (← links)
- Architecture of manufacturing scheduling systems: literature review and an integrated proposal (Q976436) (← links)
- Mathematical models for job-shop scheduling problems with routing and process plan flexibility (Q988383) (← links)
- Global search algorithm for automated maintenance planning and scheduling of parts requests (Q1000953) (← links)
- Dynamic interactive stabilization of the switching Kumar-Seidman system (Q1036949) (← links)
- Operations risk management by optimally planning the qualified workforce capacity (Q1039800) (← links)
- The optimality of balancing workloads in certain types of flexible manufacturing systems (Q1066800) (← links)
- The efficient computer implementation of a large-scale integer goal programming model (Q1079114) (← links)
- A mixed integer program for loading and scheduling multiple flexible manufacturing cells (Q1082246) (← links)
- A multiobjective, multi-level heuristic for dynamic resource constrained scheduling problems (Q1096529) (← links)
- A survey of priority rule-based scheduling (Q1111923) (← links)
- Real-time scheduling of an automated manufacturing center (Q1116883) (← links)
- Tradeoff solutions in single machine production scheduling for minimizing flow time and maximum penalty (Q1121167) (← links)
- Minimizing the number of tardy jobs for \(m\) parallel machines (Q1127174) (← links)
- Resource constrained project scheduling with multiple objectives: a decision support approach (Q1202275) (← links)
- A review of open queueing network models of manufacturing systems (Q1205351) (← links)
- Capacitated two-parallel machines scheduling to minimize sum of job completion times (Q1208482) (← links)
- Aggregate scheduling and network solving of multi-stage and multi-item manufacturing systems (Q1291703) (← links)
- Reduction of job-shop problems to flow-shop problems with precedence constraints (Q1296695) (← links)
- Setup time reduction and competitive advantage in a closed manufacturing cell (Q1309963) (← links)
- Comparative performance analysis of priority rules in a constrained flow shop with multiple processors environment (Q1319566) (← links)
- Aggregate production planning by stochastic control (Q1330539) (← links)
- A decomposition approach in a DSS for a resource constrained scheduling problem (Q1342055) (← links)
- Genetic learning of dynamic scheduling within a simulation environment (Q1342109) (← links)
- Optimal match-up strategies in stochastic scheduling (Q1346690) (← links)
- Learning complementarity and setup time reduction. (Q1406634) (← links)
- A fuzzy robust scheduling approach for product development projects. (Q1410333) (← links)
- Re-entrant lines (Q1801807) (← links)
- Match-up scheduling under a machine breakdown (Q1806884) (← links)
- Analysis of the twisting department at superior cable corporation: A case study (Q1809862) (← links)
- A contracting model for flexible distributed scheduling (Q1815836) (← links)
- Optimal production and setup control of a dynamic two-product manufacturing system: Analytical solution (Q1816625) (← links)
- Heuristics for operator scheduling in group technology cells (Q1891236) (← links)
- A discrete firefly algorithm for solving the flexible job-shop scheduling problem in a make-to-order manufacturing system (Q2052988) (← links)
- Weighted completion time minimization for capacitated parallel machines (Q2085744) (← links)
- A survey of job shop scheduling problem: the types and models (Q2146994) (← links)
- Terminal inventory level constraints for online production scheduling (Q2239846) (← links)
- Multistage stochastic demand-side management for price-making major consumers of electricity in a co-optimized energy and reserve market (Q2273924) (← links)
- Scatter search for minimizing weighted tardiness in a single machine scheduling with setups (Q2403268) (← links)
- Heuristics and augmented neural networks for task scheduling with non-identical machines (Q2432852) (← links)