Person:161997: Difference between revisions

From MaRDI portal
Person:161997
Created automatically from import230924090903
 
m AuthorDisambiguator moved page Kyparisis, George J. to Kyparisis, George J.: Duplicate
 
(No difference)

Latest revision as of 15:25, 6 December 2023

Available identifiers

zbMath Open kyparisis.george-jMaRDI QIDQ161997

List of research outcomes





PublicationDate of PublicationType
Erratum to: ``Competitive two-agent scheduling and its applications2024-09-05Paper
A classification of dynamic programming formulations for offline deterministic single-machine scheduling problems2022-12-12Paper
Two-stage no-wait proportionate flow shop scheduling with minimal service time variation and optional job rejection2022-11-17Paper
New results for single-machine scheduling with past-sequence-dependent setup times and due date-related objectives2019-06-25Paper
The price-setting newsvendor with nonlinear salvage revenue and shortage cost2019-06-11Paper
Resale price maintenance in supply chains with general multiplicative demand2019-06-11Paper
New structural properties of supply chains with price-only contracts2019-01-15Paper
The price-setting newsvendor problem with nonnegative linear additive demand2018-05-22Paper
The three-machine proportionate open shop and mixed shop minimum makespan problems2016-10-06Paper
On index priority sequencing rules for scheduling with time-dependent job processing times2014-05-15Paper
Two-tier equilibria for supply chains with a single manufacturer and multiple asymmetric retailers2014-05-15Paper
Assembly-Line Scheduling with Concurrent Operations and Parallel Machines2012-05-30Paper
A note on equilibria for two-tier supply chains with a single manufacturer and multiple retailers2012-04-05Paper
A note on the classification of consumer demand functions with respect to retailer pass-through rates2011-08-09Paper
A note on the optimality of index priority rules for search and sequencing problems2011-04-14Paper
A unified analysis for the single-machine scheduling problem with controllable and non-controllable variable job processing times2010-06-11Paper
A note on the effects of downstream efficiency on upstream pricing2009-12-10Paper
A modified LPT algorithm for the two uniform parallel machine makespan minimization problem2009-01-08Paper
A note on the proportionate flow shop with a bottleneck machine2008-12-02Paper
Single-machine scheduling with waiting-time-dependent due dates2008-07-21Paper
Single-machine scheduling problems with past-sequence-dependent setup times2008-01-21Paper
An improved delayed-start LPT algorithm for a partition problem on two identical parallel machines2007-12-12Paper
A note on the two-stage assembly flow shop scheduling problem with uniform parallel machines2007-05-30Paper
A heuristic for maximizing the number of on-time jobs on two uniform parallel machines2007-02-20Paper
Single-machine and two-machine flowshop scheduling with general learning functions2007-01-22Paper
A note on makespan minimization in two-stage flexible flow shops with uniform machines2006-10-27Paper
Performance guarantees for flowshop heuristics to minimize makespan2005-11-04Paper
Flexible flow shop scheduling with uniform parallel machines2005-10-17Paper
Makespan minimization on uniform parallel machines with release times2004-08-16Paper
Scheduling three-operation jobs in a two-machine flow shop to minimize makespan2004-08-10Paper
Concurrent flowshop scheduling to minimize makespan.2004-05-27Paper
Single machine scheduling with release times, deadlines and tardiness objectives2002-01-13Paper
A note on weighted completion time minimization in a flexible flow shop2001-12-05Paper
The three-stage assembly flowshop scheduling problem2001-07-23Paper
https://portal.mardi4nfdi.de/entity/Q42489262001-02-09Paper
A note on scheduling flowshops with flexible stage ordering2001-01-01Paper
Flow shop and open shop scheduling with a critical machine and two operations per job2000-12-21Paper
Scheduling on uniform parallel machines to minimize maximum lateness2000-11-22Paper
https://portal.mardi4nfdi.de/entity/Q44870912000-06-21Paper
Open shop scheduling with makespan and total completion time criteria2000-02-15Paper
Project selection with discounted returns and multiple constraints1999-02-22Paper
A decision model for interdependent information system project selection1998-10-07Paper
Open shop scheduling with maximal machines1998-01-26Paper

Research outcomes over time

This page was built for person: Kyparisis, George J.