Person:299901: Difference between revisions

From MaRDI portal
Person:299901
Created automatically from import231006081045
 
m AuthorDisambiguator moved page John W. Fowler to John W. Fowler: Duplicate
 
(No difference)

Latest revision as of 21:58, 10 December 2023

Available identifiers

zbMath Open fowler.john-wMaRDI QIDQ299901

List of research outcomes

PublicationDate of PublicationType
A survey of scheduling with parallel batch (p-batch) processing2022-02-22Paper
A hybrid scheduling approach for a two-stage flexible flow shop with batch processing machines2018-04-13Paper
Single machine scheduling with interfering job sets2016-11-10Paper
Multi-mode resource-constrained project scheduling problems with non-preemptive activity splitting2016-11-10Paper
Optimal control policies for ambulance diversion2016-06-23Paper
A Progressive Hedging Approach for Surgery Planning Under Uncertainty2016-04-25Paper
Processing time generation schemes for parallel machine scheduling problems with various correlation structures2015-01-22Paper
Cross-training with Imperfect training Schemes2013-08-26Paper
Quantitative Comparison of Approximate Solution Sets for Multicriteria Optimization Problems with Weighted Tchebycheff Preference Function2011-11-17Paper
Heuristics for minimizing regular performance measures in unrelated parallel machine scheduling problems2011-01-31Paper
Interactive evolutionary multi-objective optimization for quasi-concave preference functions2010-06-11Paper
Scheduling interfering job sets on parallel machines2009-12-07Paper
A multi-criteria approach for scheduling semiconductor wafer fabrication facilities2009-08-28Paper
https://portal.mardi4nfdi.de/entity/Q53017372009-01-20Paper
Heuristics for workforce planning with worker differences2008-06-11Paper
Evaluation of heuristics for a class-constrained lot-to-order matching problem in semiconductor manufacturing2008-05-19Paper
A note on determining an optimal target by considering the dependence of holding costs and the quality characteristics2007-09-11Paper
Evaluating solution sets of a posteriori solution techniques for bi-criteria combinatorial optimization problems2007-05-15Paper
Minimizing makespan with multiple-orders-per-job in a two-machine flowshop2007-05-11Paper
Impact of permutation enforcement when minimizing total weighted tardiness in dynamic flowshops with uncertain processing times2007-04-26Paper
A framework for evaluating remote diagnostics investment decisions for semiconductor equipment suppliers2007-03-27Paper
Genetic algorithm-based subproblem solution procedures for a modified shifting bottleneck heuristic for complex job shops2006-12-14Paper
https://portal.mardi4nfdi.de/entity/Q54794582006-07-10Paper
https://portal.mardi4nfdi.de/entity/Q54794632006-07-10Paper
Evaluation of nondominated solution sets for \(k\)-objective optimization problems: an exact method and approximations2006-06-30Paper
Heuristic scheduling of jobs on parallel batch machines with incompatible job families and unequal ready times2005-06-27Paper
Heuristics for minimizing total weighted tardiness in complex job shops2005-06-14Paper
Optimal batching in a wafer fabrication facility using a multiproduct G/G/c model with batch processing2005-05-11Paper
Genetic algorithm based scheduling of parallel batch machines with incompatible job families to minimize total weighted tardiness2005-04-18Paper
Bin covering algorithms in the second stage of the lot to order matching problem2005-03-16Paper
Minimizing total weighted tardiness on a single batch process machine with incompatible job families2004-11-12Paper
Multiple response optimization using mixture-designed experiments and desirability functions in semiconductor scheduling2004-05-18Paper
A Sequential Stopping Rule for a Steady-State Simulation Based on Time-Series Forecasting2004-03-16Paper
A multi-population genetic algorithm to solve multi-objective scheduling problems for parallel machines.2004-02-14Paper
https://portal.mardi4nfdi.de/entity/Q45463982002-08-20Paper
A modified shifting bottleneck heuristic for minimizing total weighted tardiness in complex job shops2002-08-08Paper
https://portal.mardi4nfdi.de/entity/Q47899142001-01-01Paper
Comparison and evaluation of lot-to-order matching policies for a semiconductor assembly and test facility2000-08-22Paper
The use of upstream and downstream information in scheduling semiconductor batch operations1999-05-17Paper

Research outcomes over time


Doctoral students

No records found.


Known relations from the MaRDI Knowledge Graph

PropertyValue
MaRDI profile typeMaRDI person profile
instance ofhuman


This page was built for person: John W. Fowler