Christos P. Koulamas

From MaRDI portal
Revision as of 14:25, 6 December 2023 by AuthorDisambiguator (talk | contribs) (AuthorDisambiguator moved page Christos P. Koulamas to Christos P. Koulamas: Duplicate)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Person:596458

Available identifiers

zbMath Open koulamas.christos-pMaRDI QIDQ596458

List of research outcomes

PublicationDate of PublicationType
A classification of dynamic programming formulations for offline deterministic single-machine scheduling problems2022-12-12Paper
Two-stage no-wait proportionate flow shop scheduling with minimal service time variation and optional job rejection2022-11-17Paper
New results for scheduling to minimize tardiness on one machine with rejection and related problems2021-12-13Paper
The proportionate flow shop total tardiness problem2020-05-07Paper
Three-stage ordered flow shops with either synchronous flow, blocking or no-idle machines2020-03-10Paper
The evolution of schematic representations of flow shop scheduling problems2020-03-06Paper
Analysis of flow shop scheduling anomalies2019-09-09Paper
New results for single-machine scheduling with past-sequence-dependent setup times and due date-related objectives2019-06-25Paper
The price-setting newsvendor with nonlinear salvage revenue and shortage cost2019-06-11Paper
Resale price maintenance in supply chains with general multiplicative demand2019-06-11Paper
Scheduling research and the first decade of NRLQ: A historical perspective2019-05-02Paper
On equivalence between the proportionate flow shop and single‐machine scheduling problems2019-05-02Paper
A note on combined job selection and sequencing problems2019-03-26Paper
Review of the ordered and proportionate flow shop scheduling research2019-03-05Paper
New structural properties of supply chains with price-only contracts2019-01-15Paper
A constraint generation approach for two-machine shop problems with jobs selection2018-05-25Paper
The price-setting newsvendor problem with nonnegative linear additive demand2018-05-22Paper
Minimizing the number of tardy jobs in two-machine settings with common due date2017-10-17Paper
The proportionate two-machine no-wait job shop scheduling problem2016-10-07Paper
The three-machine proportionate open shop and mixed shop minimum makespan problems2016-10-06Paper
A note on scheduling problems with competing agents and earliness minimization objectives2016-10-06Paper
The two-machine no-wait general and proportionate open shop makespan problem2016-06-23Paper
Erratum—One Machine Sequencing to Minimize Total Tardiness: A Fourth Theorem for Emmons2015-11-20Paper
A Constraint Generation Approach for the Two-Machine Flow Shop Problem with Jobs Selection2015-10-16Paper
A note on the complexity of scheduling problems with linear job deterioration2015-06-22Paper
Proportionate flow shop: New complexity results and models with due date assignment2015-05-06Paper
On index priority sequencing rules for scheduling with time-dependent job processing times2014-05-15Paper
Two-tier equilibria for supply chains with a single manufacturer and multiple asymmetric retailers2014-05-15Paper
An \(O(n^{2})\) algorithm for the variable common due date, minimal tardy jobs bicriteria two-machine flow shop problem with ordered machines2012-12-29Paper
A note on minimizing the sum of quadratic completion times on two identical parallel machines2012-10-23Paper
Assembly-Line Scheduling with Concurrent Operations and Parallel Machines2012-05-30Paper
A note on equilibria for two-tier supply chains with a single manufacturer and multiple retailers2012-04-05Paper
A note on the classification of consumer demand functions with respect to retailer pass-through rates2011-08-09Paper
A note on the optimality of index priority rules for search and sequencing problems2011-04-14Paper
A note on single-machine scheduling with job-dependent learning effects2010-09-09Paper
A unified analysis for the single-machine scheduling problem with controllable and non-controllable variable job processing times2010-06-11Paper
A faster algorithm for a due date assignment problem with tardy jobs2010-05-07Paper
A note on the effects of downstream efficiency on upstream pricing2009-12-10Paper
The single-machine total tardiness scheduling problem: review and extensions2009-11-17Paper
A modified LPT algorithm for the two uniform parallel machine makespan minimization problem2009-01-08Paper
A faster fully polynomial approximation scheme for the single-machine total tardiness problem2008-12-02Paper
A note on the proportionate flow shop with a bottleneck machine2008-12-02Paper
Single-machine scheduling with waiting-time-dependent due dates2008-07-21Paper
Single-machine scheduling problems with past-sequence-dependent setup times2008-01-21Paper
An improved delayed-start LPT algorithm for a partition problem on two identical parallel machines2007-12-12Paper
A note on the two-stage assembly flow shop scheduling problem with uniform parallel machines2007-05-30Paper
A heuristic for maximizing the number of on-time jobs on two uniform parallel machines2007-02-20Paper
Single-machine and two-machine flowshop scheduling with general learning functions2007-01-22Paper
A note on makespan minimization in two-stage flexible flow shops with uniform machines2006-10-27Paper
Performance guarantees for flowshop heuristics to minimize makespan2005-11-04Paper
Flexible flow shop scheduling with uniform parallel machines2005-10-17Paper
Makespan minimization on uniform parallel machines with release times2004-08-16Paper
Scheduling three-operation jobs in a two-machine flow shop to minimize makespan2004-08-10Paper
Concurrent flowshop scheduling to minimize makespan.2004-05-27Paper
Real-Time Vision-Based System for Textile Fabric Inspection2003-03-19Paper
Single machine scheduling with release times, deadlines and tardiness objectives2002-01-13Paper
A note on weighted completion time minimization in a flexible flow shop2001-12-05Paper
The three-stage assembly flowshop scheduling problem2001-07-23Paper
A new constructive heuristic for the flowshop scheduling problem2001-03-22Paper
https://portal.mardi4nfdi.de/entity/Q42489262001-02-09Paper
A note on scheduling flowshops with flexible stage ordering2001-01-01Paper
Flow shop and open shop scheduling with a critical machine and two operations per job2000-12-21Paper
Scheduling on uniform parallel machines to minimize maximum lateness2000-11-22Paper
https://portal.mardi4nfdi.de/entity/Q44870912000-06-21Paper
Open shop scheduling with makespan and total completion time criteria2000-02-15Paper
Throughput-dependent periodic maintenance policies for general production units2000-01-11Paper
Simultaneous determination of the cutting speed and lot size values in machining systems1999-12-13Paper
Single-machine scheduling with time windows and earliness/tardiness penalties1999-02-22Paper
Machining economics with machine interference considerations1998-12-03Paper
Application of ELSP solution techniques to the deterministic robotic scheduling problem1998-12-02Paper
Optimal solutions for the machining economics problem with stochastically distributed tool lives1998-10-18Paper
A guaranteed accuracy shifting bottleneck algorithm for the two-machine flowshop total tardiness problem1998-09-27Paper
Part selection and tool allocation in discrete parts manufacturing1998-04-02Paper
Open shop scheduling with maximal machines1998-01-26Paper
Maximizing the weighted number of on-time jobs in single machine scheduling with time windows1997-09-28Paper
Decomposition and hybrid simulated annealing heuristics for the parallel-machine total tardiness problem1997-08-05Paper
A total tardiness problem with preprocessing included1997-01-21Paper
Scheduling two parallel semiautomatic machines to minimize machine interference1997-01-06Paper
https://portal.mardi4nfdi.de/entity/Q48856151996-08-22Paper
A note on finite replenishment inventory systems with continuous deterministic demand1996-06-16Paper
Machining economics with phase-type distributed tool lives and periodic maintenance control1996-05-30Paper
The Total Tardiness Problem: Review and Extensions1995-11-09Paper
Lot size variability effects on manufacturing lead time1994-10-26Paper
A heuristic for the single machine tardiness problem1994-02-28Paper
Optimal production strategies for announced unit cost increases1993-10-11Paper
Design of tool magazine and operational areas for a multi-tool machine1993-04-01Paper
Exact Expressions for the First Two Moments of Job Flow Time in a Job Shop1993-01-17Paper
A bi-criterion algorithm for minimizing machine interference and reducing job waiting time1993-01-16Paper
A stochastic model for a machining cell with tool failure and tool replacement considerations1992-10-05Paper
Simultaneous determination of optimal machining conditions and tool replacement policies in constrained machining economics problems by geometric programming1991-01-01Paper
Job flow-time in a job shop subject to machine breakdowns with applications in modelling job shop in-process inventories1990-01-01Paper
Optimal lot-sizing with some defective output and learning1990-01-01Paper
Optimal buffer space size in two-stage machining systems with Markovian or non-Markovian tool life processes1989-01-01Paper

Research outcomes over time


Doctoral students

No records found.


Known relations from the MaRDI Knowledge Graph

PropertyValue
MaRDI profile typeMaRDI person profile
instance ofhuman


This page was built for person: Christos P. Koulamas