An effective shuffled frog-leaping algorithm for multi-mode resource-constrained project scheduling problem
From MaRDI portal
Publication:433107
DOI10.1016/J.INS.2011.06.014zbMath1242.90082OpenAlexW1971534795MaRDI QIDQ433107
Publication date: 13 July 2012
Published in: Information Sciences (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ins.2011.06.014
backward improvementcombined local searchmulti-mode forwardmulti-mode permutation based local searchmulti-mode resource-constrained project schedulingmulti-mode serial schedule generation schemeshuffled frog-leaping algorithm
Related Items (9)
A diversified shuffled frog leaping: an application for parameter identification ⋮ Solving distributed two-stage hybrid flowshop scheduling using a shuffled frog-leaping algorithm with memeplex grouping ⋮ A path-relinking algorithm for the multi-mode resource-constrained project scheduling problem ⋮ Credit risk prediction using fuzzy immune learning ⋮ A data-driven \textit{meta}-learning recommendation model for multi-mode resource constrained project scheduling problem ⋮ A fuzzy time-dependent project scheduling problem ⋮ An updated survey of variants and extensions of the resource-constrained project scheduling problem ⋮ Multi-mode resource-constrained project scheduling problem with material ordering under bonus-penalty policies ⋮ An innovative four-layer heuristic for scheduling multi-mode projects under multiple resource constrains
Uses Software
Cites Work
- Differential evolution for solving multi-mode resource-constrained project scheduling problems
- An iterative scheduling technique for resource-constrained project scheduling
- Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
- PSPLIB -- a project scheduling problem library
- Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm
- An exact algorithm for project scheduling with multiple modes
- A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version.
- Strength and adaptability of problem-space based neighborhoods for resource-constrained scheduling
- A hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problem
- A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems
- Solving a bi-criteria permutation flow-shop problem using shuffled frog-leaping algorithm
- A hybrid scatter search for the discrete time/resource trade-off problem in project scheduling
- Solving the Multi-Mode Resource-Constrained Project Scheduling Problem with genetic algorithms
- Project scheduling with multiple modes: A genetic algorithm
- Simulated annealing for multi-mode resource-constrained project scheduling
This page was built for publication: An effective shuffled frog-leaping algorithm for multi-mode resource-constrained project scheduling problem