A parameter-tuned genetic algorithm for the resource investment problem with discounted cash flows and generalized precedence relations
From MaRDI portal
Publication:1025246
DOI10.1016/j.cor.2009.01.016zbMath1162.90464OpenAlexW1971901162MaRDI QIDQ1025246
Amir Abbas Najafi, Moslem Shahsavar, Seyed Taghi Akhavan Niaki
Publication date: 18 June 2009
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2009.01.016
project schedulinggenetic algorithmsnet present valuegeneralized precedence relationsresponse surface methodologydiscounted cash flows
Learning and adaptive systems in artificial intelligence (68T05) Deterministic scheduling theory in operations research (90B35)
Related Items
Solving multi-mode time–cost–quality trade-off problems under generalized precedence relations ⋮ A hybrid vendor managed inventory and redundancy allocation optimization problem in supply chain management: an NSGA-II with tuned parameters ⋮ Bi-objective vibration damping optimization for congested location-pricing problem ⋮ Project scheduling and equipment planning with random breakdowns ⋮ Semi-robust layout design for cellular manufacturing in a dynamic environment ⋮ Statistical design of genetic algorithms for combinatorial optimization problems ⋮ A fuzzy genetic algorithm with varying population size to solve an inventory model with credit-linked promotional demand in an imprecise planning horizon ⋮ An efficient genetic algorithm to maximize net present value of project payments under inflation and bonus-penalty policy in resource investment problem ⋮ Finding sums of powers using physical arguments ⋮ Inventory model of a deteriorating item with price and credit linked fuzzy demand: a fuzzy differential equation approach
Cites Work
- Unnamed Item
- Unnamed Item
- The scheduling of activities to maximize the net present value of projects
- A genetic algorithm for resource investment problem with discounted cash flows
- A genetic algorithm for resource investment project scheduling problem, tardiness permitted with penalty
- Fuzzy goal programming - an additive model
- An optimal procedure for the resource-constrained project scheduling problem with discounted cash flows and generalized precedence relations
- Activity nets: A guided tour through some recent developments
- Resource-constrained project scheduling: A survey of recent developments.
- Project scheduling. A research handbook.
- Scheduling a project to maximize its net present value: An integer programming approach
- Discrete-continuous project scheduling with discounted cash flows - a tabu search approach
- Minimizing Costs of Resource Requirements in Project Networks Subject to a Fixed Completion Time
- A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem
- Scheduling a Project to Maximize Its Present Value: A Zero-One Programming Approach
- On modelling payments in projects
- A Branch and Bound Procedure for the Resource Constrained Project Scheduling Problem with Discounted Cash Flows
- Performance of the heuristic procedures for constrained projects with progress payments
- Optimization guided lower and upper bounds for the resource investment problem
- Cash Flows in Networks
- The payment scheduling problem
- Minimizing Resource Availability Costs in Time-Limited Project Networks
- The resource renting problem subject to temporal constraints
- Four payment models for the multi-mode resource constrained project scheduling problem with discounted cash flows