Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs

From MaRDI portal
Revision as of 11:03, 31 January 2024 by Import240129110113 (talk | contribs) (Created automatically from import240129110113)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Publication:1278242

DOI10.1016/0377-2217(94)00339-4zbMath0924.90085OpenAlexW2020625389MaRDI QIDQ1278242

Ping Yang, John J. Liu

Publication date: 10 November 1999

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/0377-2217(94)00339-4



Related Items

Using fuzzy analytic hierarchy process and particle swarm optimisation for balanced and defective supply chain problems considering WEEE/RoHS directives, A rework-based dispatching algorithm for module process in TFT-LCD manufacture, Effect of repair cost on the rework decision-making in an economic production quantity model, Determining the optimal lot size for the finite production model with an imperfect rework process of defective items, Optimal economic production quantity policy for imperfect process with imperfect repair and maintenance, Optimizing a production system with rework and equal sized batch shipments, Integrated supply chain cooperative inventory model with payment period being dependent on purchasing price under defective rate condition, Optimal production correction and maintenance policy for imperfect process, Optimum policy for a production system with major repair and preventive maintenance, Mathematical modeling for determining the replenishment policy for EMQ model with rework and multiple shipments, Three-layer supply chain - A production-inventory model for reworkable items, Optimal product quality of supply chain based on information traceability in fashion and textiles industry: an adverse logistics perspective, Production lot size problem with failure in repair and backlogging derived without derivatives, Disposal versus rework -- inventory control in a production system with random yield, A three layer supply chain model with multiple suppliers, manufacturers and retailers for multiple items, A production policy considering reworking of imperfect items and trade credit, Economic ordering policy for an item with imperfect quality subject to the in-house inspection, Optimal replenishment policy for imperfect quality EMQ model with rework and backlogging, Determining a threshold control policy for an imperfect production system with rework jobs, An optimal batch size for an imperfect production system with quality assurance and rework, On reworks in a serial process with flexible windows of time, Mathematical modelling for determining economic batch size and optimal number of deliveries for EPQ model with quality assurance, Lot sizing in a production system with rework and product deterioration, Numerical method for determination of reworking or scraping the defective items in a finite production rate model, Numerical method for determination of the optimal lot size for a manufacturing system with discontinuous issuing policy and rework, Batching work and rework processes with limited deterioration of reworkables, Optimal economic production quantity policy for randomly failing process with minimal repair, backorder and preventive maintenance



Cites Work