Increasing airport capacity utilisation through optimum slot scheduling: review of current developments and identification of future needs
Publication:1707666
DOI10.1007/s10951-016-0496-7zbMath1391.90333OpenAlexW2523280206WikidataQ59615364 ScholiaQ59615364MaRDI QIDQ1707666
Konstantinos G. Zografos, Konstantinos N. Androutsopoulos, Michael A. Madas
Publication date: 3 April 2018
Published in: Journal of Scheduling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10951-016-0496-7
resource allocationresource-constrained schedulingcapacity planningairport demand managementairport slot allocation
Deterministic scheduling theory in operations research (90B35) Performance evaluation, queueing, and scheduling in the context of computer systems (68M20)
Related Items (7)
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- A multi-objective evolutionary algorithm to exploit the similarities of resource allocation problems
- Experimental investigation of heuristics for resource-constrained project scheduling: an update
- Case-based heuristic selection for timetabling problems
- Integrated airline scheduling
- Semi-active, active, and non-delay schedules for the resource-constrained project scheduling problem
- A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version.
- Resource-constrained project scheduling: A critical activity reordering heuristic
- Resource-constrained project scheduling: Notation, classification, models, and methods
- Project scheduling with resource constraints: A branch and bound approach. Note by Frederik Kaefer
- Metaheuristics for a scheduling problem with rejection and tardiness penalties
- Flight gate assignment and recovery strategies with stochastic arrival and departure times
- Airport runway scheduling
- An Integrated Scheduling and Operations Approach to Airport Congestion Mitigation
- An Integer Optimization Approach to Large-Scale Air Traffic Flow Management
- Solving Project Scheduling Problems by Minimum Cut Computations
- Reduce-and-Split Cuts: Improving the Performance of Mixed-Integer Gomory Cuts
- A self-adapting genetic algorithm for project scheduling under resource constraints
This page was built for publication: Increasing airport capacity utilisation through optimum slot scheduling: review of current developments and identification of future needs