A hybrid multiobjective genetic algorithm for robust resource-constrained project scheduling with stochastic durations
From MaRDI portal
Publication:1955186
DOI10.1155/2012/786923zbMath1264.90188OpenAlexW2047163713WikidataQ58911921 ScholiaQ58911921MaRDI QIDQ1955186
Ke-Wei Yang, Qing-Song Zhao, Ying-Wu Chen, Li-Ning Xing, Jian Xiong
Publication date: 11 June 2013
Published in: Mathematical Problems in Engineering (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1155/2012/786923
Multi-objective and goal programming (90C29) Approximation methods and heuristics in mathematical programming (90C59) Stochastic scheduling theory in operations research (90B36)
Related Items (2)
A hybrid multiobjective evolutionary approach for flexible job-shop scheduling problems ⋮ Resilience analysis for project scheduling with renewable resource constraint and uncertain activity durations
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- New competitive results for the stochastic resource-constrained project scheduling problem: exploring the benefits of pre-processing
- A population-based approach to the resource-constrained project scheduling problem
- Bi-objective resource-constrained project scheduling with robustness and makespan criteria
- Experimental investigation of heuristics for resource-constrained project scheduling: an update
- A genetic algorithm for resource investment project scheduling problem, tardiness permitted with penalty
- A survey of variants and extensions of the resource-constrained project scheduling problem
- Resource-constrained project scheduling: A critical activity reordering heuristic
- Resource-constrained project scheduling: A survey of recent developments.
- Project scheduling under uncertainty: survey and research potentials
- Resource-constrained project scheduling: Notation, classification, models, and methods
- A hybrid genetic algorithm for the resource-constrained project scheduling problem
- Minimizing Costs of Resource Requirements in Project Networks Subject to a Fixed Completion Time
- Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems
- Genetic local search for multi-objective combinatorial optimization
This page was built for publication: A hybrid multiobjective genetic algorithm for robust resource-constrained project scheduling with stochastic durations