A Decomposition-Based Genetic Algorithm for the Resource-Constrained Project-Scheduling Problem

From MaRDI portal
Revision as of 16:46, 4 February 2024 by Import240129110113 (talk | contribs) (Created automatically from import240129110113)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Publication:3392089

DOI10.1287/opre.1060.0358zbMath1167.90664OpenAlexW2075675164MaRDI QIDQ3392089

Mario Vanhoucke, Dieter Debels

Publication date: 13 August 2009

Published in: Operations Research (Search for Journal in Brave)

Full work available at URL: https://semanticscholar.org/paper/01a08fadd8a3e324ebeea96d6db82a91d924a8a4




Related Items (42)

A genetic algorithm for the robust resource leveling problemA scatter search heuristic for maximising the net present value of a resource-constrained project with fixed activity cash flowsJob scheduling of diffusion furnaces in semiconductor fabrication facilitiesExact algorithms for single-machine scheduling with time windows and precedence constraintsSolving stochastic resource-constrained project scheduling problems by closed-loop approximate dynamic programmingScheduling resource-constrained projects with a flexible project structureOptimization Strategies for Resource-Constrained Project Scheduling Problems in Underground MiningAn approach using SAT solvers for the RCPSP with logical constraintsEvolutionary multi-objective resource allocation and scheduling in the Chinese navigation satellite system projectAn exact composite lower bound strategy for the resource-constrained project scheduling problemA filter-and-fan approach with adaptive neighborhood switching for resource-constrained project schedulingGenetic algorithm for the resource-constrained project scheduling problemGoing to the core of hard resource-constrained project scheduling instancesAn evolutionary approach for resource constrained project scheduling with uncertain changesAn analysis of network and resource indicators for resource-constrained project scheduling problem instancesApplying local rescheduling in response to schedule disruptionsAn Improved Genetic Algorithm for the Resource-Constrained Project Scheduling ProblemA prediction model for ranking branch-and-bound procedures for the resource-constrained project scheduling problemA branch-and-bound algorithm for the unit-capacity resource constrained project scheduling problem with transfer timesNew resource-constrained project scheduling instances for testing (meta-)heuristic scheduling algorithmsA \((\mu ,\, \lambda )\)-coordination mechanism for agent-based multi-project schedulingMulti-mode resource-constrained project scheduling using RCPSP and SAT solversA Boolean satisfiability approach to the resource-constrained project scheduling problemUnnamed ItemMulti-objective inventory control using electromagnetism-like meta-heuristicA random key based genetic algorithm for the resource constrained project scheduling problemA study of the Bienstock-Zuckerberg algorithm: applications in mining and resource constrained project schedulingTowards merging binary integer programming techniques with genetic algorithmsMode-based versus activity-based search for a nonredundant resolution of the multimode resource-constrained project scheduling problemResource-constrained project scheduling with activity splitting and setup timesAn effective shuffled frog-leaping algorithm for resource-constrained project scheduling problemA neurogenetic approach for the resource-constrained project scheduling problemA survey of hybrid metaheuristics for the resource-constrained project scheduling problemA multi‐agent system for the decentralized resource‐constrained multi‐project scheduling problemProactive policies for the stochastic resource-constrained project scheduling problemOptimizing online recurring promotions for dual-channel retailers: segmented markets with multiple objectivesMultistage stochastic programming approach for joint optimization of job scheduling and material ordering under endogenous uncertaintiesA genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problemAn innovative four-layer heuristic for scheduling multi-mode projects under multiple resource constrainsOn the use of genetic programming to evolve priority rules for resource constrained project scheduling problemsPersonnel scheduling and supplies provisioning in emergency relief operationsA competitive magnet-based genetic algorithm for solving the resource-constrained project scheduling problem


Uses Software



This page was built for publication: A Decomposition-Based Genetic Algorithm for the Resource-Constrained Project-Scheduling Problem