| Publication | Date of Publication | Type |
|---|
| Maximizing the net present value of a project under uncertainty: activity delays and dynamic policies | 2024-07-16 | Paper |
| An improved decomposition-based heuristic for truck platooning | 2023-11-15 | Paper |
| Parallel Machine Scheduling Under Uncertainty: Models and Exact Algorithms | 2023-01-11 | Paper |
| A pessimist's approach to one-sided matching | 2022-12-12 | Paper |
| Recovery from demand disruption: two-stage financing strategy for a capital-constrained supply chain under uncertainty | 2022-07-22 | Paper |
| The TSP with drones: The benefits of retraversing the arcs | 2022-07-07 | Paper |
| Exact and Approximation Algorithms for the Expanding Search Problem | 2022-06-28 | Paper |
| Time-critical testing and search problems | 2021-11-09 | Paper |
| Polyhedral Results and Branch-and-Cut for the Resource Loading Problem | 2021-06-23 | Paper |
| Scheduling a single parallel-batching machine with non-identical job sizes and incompatible job families | 2021-02-03 | Paper |
| Exact algorithms for budgeted prize-collecting covering subgraph problems | 2021-01-10 | Paper |
| A Branch-and-Price Algorithm for Parallel Machine Scheduling Using ZDDs and Generic Branching | 2020-12-03 | Paper |
| A two-stage robust model for a reliable \(p\)-center facility location problem | 2020-04-24 | Paper |
| New results on the coordination of transportation and batching scheduling | 2020-01-29 | Paper |
| Timely exposure of a secret project: Which activities to monitor? | 2019-09-17 | Paper |
| Scheduling Markovian PERT networks to maximize the net present value: new results | 2019-06-11 | Paper |
| Sequential testing of \(n\)-out-of-\(n\) systems: precedence theorems and exact methods | 2019-01-09 | Paper |
| New strategies for stochastic resource-constrained project scheduling | 2018-11-07 | Paper |
| Precedence theorems and dynamic programming for the single-machine weighted tardiness problem | 2018-10-30 | Paper |
| Minimum-cost diagnostic strategies for \(k\)-out-of-\(n\) systems with imperfect tests | 2018-09-25 | Paper |
| An exact algorithm for parallel machine scheduling with conflicts | 2017-08-25 | Paper |
| Evolutionary multi-objective resource allocation and scheduling in the Chinese navigation satellite system project | 2016-10-07 | Paper |
| Resource loading with time windows | 2016-10-06 | Paper |
| Practical solutions for a dock assignment problem with trailer transportation | 2016-10-06 | Paper |
| Exact algorithms for single-machine scheduling with time windows and precedence constraints | 2016-09-08 | Paper |
| Project planning with alternative technologies in uncertain environments | 2016-07-25 | Paper |
| Coloring graphs using two colors while avoiding monochromatic cycles | 2016-06-29 | Paper |
| A combination of flow shop scheduling and the shortest path problem | 2015-07-10 | Paper |
| Self-imposed time windows in vehicle routing problems | 2015-04-10 | Paper |
| Optimal solutions for a dock assignment problem with trailer transportation | 2014-09-26 | Paper |
| Scheduling modular projects on a bottleneck resource | 2014-08-18 | Paper |
| Complexity results and exact algorithms for robust knapsack problems | 2014-06-30 | Paper |
| Robust maximum weighted independent-set problems on interval graphs | 2014-03-14 | Paper |
| Resource allocation by means of project networks: Dominance results | 2012-01-18 | Paper |
| Optimization models for targeted offers in direct marketing: exact and heuristic algorithms | 2011-06-07 | Paper |
| New competitive results for the stochastic resource-constrained project scheduling problem: exploring the benefits of pre-processing | 2011-05-30 | Paper |
| Exact algorithms for a generalization of the order acceptance and scheduling problem in a single-machine environment | 2010-10-15 | Paper |
| Exact Algorithms for Coloring Graphs While Avoiding Monochromatic Cycles | 2010-07-20 | Paper |
| Single-pass and approximate dynamic-programming algorithms for order acceptance and capacity planning | 2010-04-21 | Paper |
| Scheduling Markovian PERT networks to maximize the net present value | 2010-03-18 | Paper |
| Scheduling for stability in single-machine production systems | 2009-08-28 | Paper |
| Efficient solutions for mastermind using genetic algorithms | 2009-02-12 | Paper |
| Dynamic order acceptance and capacity planning on a single bottleneck resource | 2008-05-29 | Paper |
| Meta-heuristics for stable scheduling on a single machine | 2008-01-23 | Paper |
| Proactive-reactive project scheduling trade-offs and procedures | 2007-03-09 | Paper |
| A hybrid scatter search/electromagnetism meta-heuristic for project scheduling | 2005-10-26 | Paper |
| The complexity of machine scheduling for stability with a single disrupted job | 2005-08-25 | Paper |
| Identification and illumination of popular misconceptions about project scheduling and time buffering in a resource-constrained environment | 2005-04-26 | Paper |
| Project scheduling under uncertainty: survey and research potentials | 2005-04-21 | Paper |
| The generation of stable project plans | 2005-02-11 | Paper |
| The construction of stable project baseline schedules | 2004-08-19 | Paper |
| On the connected (sub)partition polytope | N/A | Paper |